Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 24, 2026 at 8:00 PM
Updated March 25, 2026
Site work and new construction of a museum in Kulm, North Dakota. Completed plans call civil work for a museum.
This construction project consists of mainly earthwork, poured in place concrete, granite stone slabs with etched Native art work, corten steel panels, aluminum panels, stainless steel imbed artwork, welding and tree plantings. The corten steel and aluminum panels are curved with laser cut Native artwork. The work is divided into one base bid and 4 additional add alternates. The Project consists of a new metal, concrete and granite monument at a North Dakota State Historic Site. There are four trees to be set around the structure. To accommodate elders and comply with ADA a new ADA concrete parking stall is in the design. The outer wall has laser cut metal panels of aluminum and corten steel set on a steel beam secured to grade with helical piles. The center has a concrete patio with metal inserts. there is a large pylon in the center skinned with granite. The metal, concrete and granite all have Indigenous created artwork that is part of the overall project. Four trees planted in the cardinal coordinates provide natural places for people to leave prayer ties and find shade. Finally there are solid stone benches for seating both inside the ring and on the outside. Location- Whitestone Hill State Historical Site 7310 86th St. SE Kulm, North Dakota 58456 Complete the work by October 9, 2026
Bid Results
Museum
$219,000.00
Public - State/Provincial
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 19, 2026
April 20, 2026
7310 86th St SE, Kulm, ND
Related To This Project
Kulm, ND
Bid Date: Sep 18 2023
West Fargo, ND
Bid Date: Mar 20 2024
Bowbells, ND
Bid Date: Mar 18 2024
Kenmare, ND
Bid Date: Mar 19 2024
West Fargo, ND
Bid Date: Mar 15 2024
Fargo, ND
Bid Date: Mar 18 2024
Dickinson, ND
Bid Date: Mar 13 2024
Grand Forks AFB, ND
Bid Date: Jul 19 2024
Forbes, ND
Bid Date: Mar 01 2024
Bismarck, ND
Bid Date: Mar 18 2024
Bismarck, ND
Bid Date: Mar 18 2024
Mandan, ND
Bid Date: Aug 09 2024
Watford City, ND
Bid Date: Feb 29 2024
West Fargo, ND
Bid Date: Mar 21 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
