BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 24, 2026 at 8:00 PM

Updated March 25, 2026

Site work and new construction of a museum in Kulm, North Dakota. Completed plans call civil work for a museum.

This construction project consists of mainly earthwork, poured in place concrete, granite stone slabs with etched Native art work, corten steel panels, aluminum panels, stainless steel imbed artwork, welding and tree plantings. The corten steel and aluminum panels are curved with laser cut Native artwork. The work is divided into one base bid and 4 additional add alternates. The Project consists of a new metal, concrete and granite monument at a North Dakota State Historic Site. There are four trees to be set around the structure. To accommodate elders and comply with ADA a new ADA concrete parking stall is in the design. The outer wall has laser cut metal panels of aluminum and corten steel set on a steel beam secured to grade with helical piles. The center has a concrete patio with metal inserts. there is a large pylon in the center skinned with granite. The metal, concrete and granite all have Indigenous created artwork that is part of the overall project. Four trees planted in the cardinal coordinates provide natural places for people to leave prayer ties and find shade. Finally there are solid stone benches for seating both inside the ring and on the outside. Location- Whitestone Hill State Historical Site 7310 86th St. SE Kulm, North Dakota 58456 Complete the work by October 9, 2026

Bid Results

Museum

$219,000.00

Public - State/Provincial

New Construction, Site Work

17

6

15

5

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 19, 2026

April 20, 2026

Project location map

7310 86th St SE, Kulm, ND

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.