BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Moberly, Missouri. Conceptual plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Federal Aid No: TAP 9900 (272) Location: North Morley Street from Route 24 to North Avenue Proposed Improvement: Install sidewalks and ADA improvements on N. Morley St. from Route 24 to North Ave. and adding pedestrian signals at the intersection of Business 63 and Route 24. Length: 1,100 Approximately DBE Goal Determination: 7% It is required that your firm be prequalified with MoDOT and listed in MoDOT's Approved Consultant Prequalification List, or your firm will be considered non-responsive. Consultant Services Required: Sidewalk/Path Pedestrian ADA Improvements Pedestrian signals at intersection of Bus. 63 & Rt. 24 This project is located along Business 63 (North Morley Street) at the intersection of State Hwy 24. This project proposes to add ADA compliant sidewalks and pedestrian signals at the intersection of Bus 63 and 24 along with new sidewalk extensions to the north and south along Morley. No sidewalks currently exist where this project is proposed to be constructed. There are tie-ins to an existing sidewalk network that the city constructed in 2021 utilizing MoDOT and FHWA grant funding through. Without those sources of funds, none of these projects would be possible. Morley is the main north-south arterial street for the City of Moberly. It also is the main retail corridor of the community hosting many of the stores, shops and restaurants visited by residents and the surrounding community. The importance of this sidewalk for the residents is enormous, especially for those that do not have access to a vehicle. They cannot safely walk or use a wheel chair to patronize the hardware stores, restaurants, or retail establishments. Adding this stretch of sidewalk is the only way they will be able to safely walk from their homes to these businesses which also connects to schools, parks, trails, downtown businesses, medical services, schools, and houses of worship. The construction of this project will incorporate ADA improvements for the disabled residents in the area, and provide them connectivity to essential services. This is the first piece of a multi-phased plan along the east side of N. Morley to connect existing city sidewalks and trail systems. A large number of the connections made to this sidewalk are made possible by projects that were built with prior Transportation Enhancement, Safe Routes to School, and Transportation Alternatives Program grants. The proposed sidewalk will be located inside MoDOT right of way and match the existing sidewalks it will be connecting to. It will be constructed of concrete and will include new traffic/pedestrian signals at the intersection, replacement of the island hard-scape to match the southern islands, and tie into existing signals on the southern half of the intersection. As seen on the attached exhibits, the project will include a base project with optional extensions that will be constructed if bids come in under budget. Contact: Thomas E Sanders Address:101 WReed Street Moberly MO 652701 Phone:660-269-7644 Any questions regarding the project may be submitted to the City to the attention of the project contact listed in the attachment. We request any questions be submitted no later than 12:00 PM local time on March 7, 2024. The method of contractor selection has not been determined at this time. MODOT - RFQ Engineering - Install sidewalks and ADA improvements on N

Conceptual

Sidewalks / Parking Lot

$498,916.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
76
Active Projects
33
Bidding Soon
535
All Active Projects
229
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 14, 2025

img_map_placeholder

N Morley St, Moberly, MO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.