Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 24, 2024 at 8:00 PM

Updated May 1, 2024

Site work for a transportation facility in Half Moon Bay, California. Completed plans call for site work for a transportation facility.

The electrical systems serving the airfield lighting at the Half Moon Bay Airport require replacement due to their deterioration, as most of these systems have been in place since the original date of construction of the Airport in 1942. The Half Moon Bay Airport Electrical Vault & Generator Project includes the installation of a new electrical vault to replace the existing electrical vault serving the airfield lighting systems, as well as a new diesel-powered generator to supply the airfield lighting systems with power for a minimum of 24 hours, in the event of electrical power outages. Back up power for the airfield lighting systems will improve the Airport's electrical resiliency and usability during power outages on the coast. Thursday, April 4, 2024 Inquiries must be received in writing via email, to enacpil@smcgov.org and alum@smcgov.org, not less than five (5) working days prior to bid opening. The Contractor shall possess either a Class A License or a combination of Class C licenses that are applicable for the majority of the work at the time this contract is awarded. The County of San Mateo reserves the right to reject any or all bids and/or waive any informalities or irregularities in any bid received. All RFI Requests were due by March 22nd, 2024 at 5:00 pm

Bid Results

Transportation Terminals

$1,233,500.00

Public - County

Site Work

34

21

30

12

Subscribe For Documents

40 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 11, 2024

June 10, 2024

Project location map

9850 Cabrillo Hwy, Half Moon Bay, CA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed