BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Downers Grove, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The work under this contract includes intermittent partial depth pavement repairs, shoulder emulsified maltene-based sealer treatment, removal and/or replacement of raised pavement markers, various crack repairs, pavement marking, maintenance of traffic, and other miscellaneous work. Questions pertaining to the intent of the contract documents may be sent to the Illinois Tollway, attention 4864D.4939_Questions@docs.e-builder.net, to be received no later than 2:00 p.m. local time on March 25, 2024. The work to be done under this contract shall be started on or about July 15, 2024 All work under this contract shall be completed by September 30, 2025. The location of the services to be performed for this contract is the Reagan Memorial Tollway (1-88) between Mile Post 76.1 and Mile Post 113.6 in Ogle, Dekalb and Kane Counties, Illinois. The work under this contract includes intermittent partial depth pavement repairs, shoulder emulsified maltene-based sealer treatment, removal and/or replacement of raised pavement markers, various crack repairs, pavement marking, maintenance of traffic, and other miscellaneous work. A completed Questionnaire and a statement of current contractual obligations on forms supplied by the Illinois Tollway will be required from the apparent low bidder once the apparent low bidder is determined. Each bid must be accompanied by a Bid Guaranty in the amount of five (5%) percent of the total amount shown in the bid for the contract. The Bid Guaranty shall be in the form of an acceptable bid bond or a bank draft, certified check or cashier's check drawn on a solvent bank made payable to the Illinois State Toll Highway Authority. The Illinois Tollway reserves the right to reject any and all bids, to waive technicalities, or cancel the solicitation.

Post-Bid

Roads / Highways

$25,000,000.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
169
Active Projects
87
Bidding Soon
1,746
All Active Projects
760
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 12, 2024

July 15, 2024

img_map_placeholder

I-88, Downers Grove, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.