BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 31, 2024 at 8:00 PM

Updated October 30, 2025

Site work, paving and new construction of a civil project in Downers Grove, Illinois. Completed plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; road / highway; water / sewer project; and water / sewer project.

The work under this contract includes earthwork and grading construction, construction of six interchange flyover ramp bridges, retaining wall construction, pavement construction, storm sewer construction, lighting and Intelligent Transportation Services (ITS) construction, utility conduit and manhole construction, watermain construction, fire suppression system installation, erosion and sediment control, landscaping and traffic control and protection. Location The location of the services to be performed for this contract is the Elgin O'Hare Western Access Tollway (I-490) between Mile Post 3.2 and Mile Post 3.9 and Illinois Route 390 Tollway (IL 390) at Mile Post 17.0 in DuPage County, Illinois. Bidders are responsible for the purchase of Complete Printed Sets and Complete Set Downloads In the event there is a discrepancy between the electronic and hard copy documents distributed by the on-line plan room, the printed documents take precedence Questions pertaining to the intent of the contract documents may be sent to the Illinois Tollway, attention 4622D.4669_Questions@docs.e-builder.net, to be received no later than 05/10/2024 at 2:00 PM CT Requests to attend the walk-through may be submitted by email to dwittmer@getipass.com. Requests must be submitted by 2:00 p.m. on April 10, 2024 There will be a limit of 2 attendees per contractor with a maximum of 25 attendees. A second session would be opened if the first session reaches capacity. In the event of a second session, this will be scheduled for April 11, 2024 at 1:00 p.m. at the same location. The intended schedule is: 9:45 am to 10:00 am - Arrive and park at 100 Sievert Court in Bensenville on the south side of Sievert Court (Site 1), see attached location map 10:00 am to 10:45 am - Escorted walk-through to existing bridge abutment locations north of South Thorndale Avenue and west of York Road 10:45 am to 11:00 am - Travel to I-490 east of railroads (Site 2) 11:00 am to 11:30 am - Escorted walk-through along future I-490 11:30 am - Conclusion of site walk-through

Under Construction

Bridges / Tunnels

$184,253,944.00

Public - State/Provincial

New Construction, Paving, Site Work

1673

16

96

9

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
452
Active Projects
243
Bidding Soon
3,322
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 31, 2024

October 7, 2024

Project location map

Multiple Locations, Downers Grove, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.