Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, outdoor lighting and renovation of a mixed-use development in Kirkland, Quebec. Design plans call for the renovation of a playground / park / athletic field; for site work for a playground / park / athletic field; and for outdoor lighting for a playground / park / athletic field.
Upgrades and improvements to the Héritage park of the City. The scope of the project includes partial demolition of the existing facilities, repairs of the existing service structures, construction of playgrounds, rest and picnic areas, replacement of the lighting system with LED equipment, construction of new paths and landscaping work, installation of park furniture and fences. TIMELINE: The owner has awarded professional consultants for the project design and construction work monitoring. Preliminary studies and conceptual planning are underway. Preliminary plans are expected to begin in May 2024. WOrking drawings are anticipated in mid-summer 2024. According to the owner's preliminary scheduling a tender for the general contractor will be issued in August/September 2024.
Design
Playgrounds / Parks / Athletic Fields
$1,500,000.00
Public - City
Outdoor Lighting, Renovation, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 15, 2024
Chem. Lantier, Kirkland, QC
Related To This Project
Kirkland, QC
Bid Date: Mar 11 2024
Kirkland, QC
Bid Date: Apr 10 2024
Kirkland, QC
Bid Date: Apr 15 2024
Kirkland, QC
Bid Date: May 07 2024
Kirkland, QC
Bid Date: May 02 2024
Kirkland, QC
--
Kirkland, QC
Bid Date: May 13 2024
Kirkland, QC
Bid Date: Apr 22 2024
Kirkland, QC
Bid Date: Mar 07 2024
Kirkland, QC
Bid Date: Feb 12 2024
Kirkland, QC
Bid Date: Feb 19 2024
Kirkland, QC
Bid Date: Dec 18 2023
Kirkland, QC
--
Kirkland, QC
Bid Date: Nov 16 2023
Kirkland, QC
Bid Date: May 02 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.