BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a civil project in Santa Ana, California. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; and water / sewer project.

Scope of Work: Includes installing new streetlighting poles, conduit, wiring, and service pedestals. Liquidated Damages 3,600 Per Calendar Day Start/Delivery Date June 2024 to September 2024 Project Duration 60 Working Days License Requirements California Class C-10 Electrical Contractors License Q&A Deadline 03/14/2024 2:00 PM (PST) Bid Proposal Guaranty shall be in the form of a cashier s or certified check payable to the City of Santa Ana, or Bid Bond issued by a corporate surety, in an amount not less than ten percent (10%) of the bid aggregate. The work to be done consists, in general, removal and installation of signs, posts, raised pavement markers, stripes, pavement markings and curb markings as shown on the plans and as described below. Items or details not specifically mentioned in the following SubSections that are required by the project plans, in the applicable 2018 Caltrans Standard Specifications, 2018 Caltrans Standard Plans, City of Santa Ana Standard Plans, Standard Specifications for Public Works Construction (SSPWC) or these Special Provisions shall be performed, constructed or installed. This work consists of street lighting installation or modifications and any other related work required to provide the intended operation at the locations shown on the project plans. This work shall be in accordance with the Plans, City of Santa Ana Standard Plan, these Special Provisions, the Standard Specifications for Public Works Construction (SSPWC), Section 86 and 87 of the 2018 Caltrans Standard Specifications, the 2018 Caltrans Standard Plans, and any applicable errata (or Revised Standard Plans). The Caltrans Standard Specifications Section 86 and 87 set forth above will control the construction materials, and construction methods for specific work relating to Street Lighting except as amended by the Project Plans. City Standard Plans and these Special Provisions. The nationwide goal for female utilization is 6.9 percent. The goal for minority utilization is 11.9 percent. Completion- (60) working days

Award

Roads / Highways

$823,888.00

Public - City

Outdoor Lighting, Paving, Site Work

12

9

8

5

Subscribe For Documents

44 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
236
Active Projects
102
Bidding Soon
2,358
All Active Projects
1,036
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 21, 2024

May 20, 2024

img_map_placeholder

Multiple Locations, Santa Ana, CA


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.