BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 1, 2024 at 7:00 PM

Updated March 2, 2024

Site work for a water / sewer project in Wentzville, Missouri. Conceptual plans call for site work for a water / sewer project.

Funds will be used to design and construct the next phases of a canoe/kayak launch on the Big Creek north of the Water Treatment Plant on land owned by the City. The next phases of the project include designing and/or constructing: Phase II 1. Vehicle access to the launch site consisting of a gravel road with fencing to prevent vehicles from leaving the road. 2. Design/install ADA accessible route to boat launch area within the creek bed. 3. Design/install Gabion wall for the bank stabilization and ADA accessible route. 4. Design/install of entrance monuments and wayfinding signage for site. Phase III 1. Design/install outstanding electric infrastructure to include emergency, security and parking lot lighting for the site. 2. Design/install upgraded dust free parking infrastructure. 3. Design/install upgraded trail infrastructure to include dust free surfaces. 4. Design/install native landscaping for screening of this facility from surrounding parcels. 5. Design/Install upgraded safety measures to ensure vehicles cannot access the creek. 6. Shoreline reinforcement to prevent high water events, erosion, or wear and tear by users from impacting the creek bank. 7. Design for the potential for expanded services such as rental/returns. This project is included in the city’s 2024-2028 Capital Improvement Program (CIP). As of March 1, 2024, construction funded for FY2026-2027. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$498,616.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
41
Active Projects
0
Bidding Soon
775
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2026

Project location map

To Be Determined, Wentzville, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.