BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Sacramento, California. Contact the soliciting agency for additional information.

solicits consultants to create a Complete Streets plan for Norwood Avenue from Main Avenue to Arcade Creek focused on safety and mobility for all users. The plan will be the first step in creating a multimodal corridor that is inclusive of all users and is reflective of the needs of the community it serves, eliminating barriers to jobs, housing, and services. The plan will establish a community-driven vision that reflects the community's and City's commitment to traffic safety and mobility and create concept level designs to transform an auto-oriented roadway into a multimodal corridor that is accessible to all users that are approved by City Council. The selected consultant(s) will develop a planning document with conceptual engineering drawings, cost estimates, and a short-term and long-term implementation plan. Funding for this project is available through state and local funds. Bid Bond 0.00% Payment Bond 0.00% Performance Bond 0.00% Question Deadline 03/21/2024 at 4:00 PM PT Online Q&A Yes Consultant's Cost Proposal shall not exceed $324,175. Consultants should prepare a Work Plan and Cost Proposal that achieve the City's project goals and objectives listed above. The Caltrans planning grant funding this effort requires all work be completed by April 2026. Consultant teams should prepare a Project Schedule to achieve this goal with adequate buffer time for any unanticipated delays. The City of Sacramento reserves the right to reject any and all proposals received in response to this request, or to negotiate separately with any source whatsoever in any manner necessary to serve the best interests of the City. The City of Sacramento may at its discretion determine not to award a contract solely on the basis of this request for proposals and will not pay for the information solicited or obtained. The method of Contractor Selection has not been Determined at this time.

Conceptual

Roads / Highways

$324,175.00

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
316
Active Projects
154
Bidding Soon
2,705
All Active Projects
1,092
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 30, 2024

img_map_placeholder

Norwood Ave, Sacramento, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.