BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 8, 2024 at 8:00 PM

Updated May 8, 2025

Site work and new construction of a fire / police facility in Kenmore, New York. Completed plans call for the construction of a 17,298-square-foot, two-story above grade fire / police facility.

SCOPE INCLUDES: site clearing; earthwork; paving; planting; waterlines; sanitary sewerage; storm drainage; cast-in-place concrete; glass-fiber reinforced concrete (GRFC); unit masonry; cast stone masonry; calcium silicate manufactured masonry units; structural steel; steel joists; steel decking; cold-formed metal framing; metal fabrications; metal pan stairs; pip & tube railings; decorative metal railings; rough carpentry; interior architectural woodwork; plastic laminate clad architectural cabinets; thermal insulation; fluid-applied membrane air barriers; aluminum composite metal wall panel; ethylene-propylene-diene-monomer (EPDM) roofing; thermoplastic-polyolefin (TPO) roofing; sheet metal flashing & trim; roof specialties; roof accessories; penetration firestopping; joint sealants; acoustic joint sealants; hollow metal doors & frames; flush wood doors; access doors & frames; rolling steel doors; bullet resistant aluminum storefront curtain walls & entrances; security window; metal framed skylights; door hardware; glazing; fire-resistant glazing; non-structural metal framing; gypsum board; ceramic tiling; resilient base & accessories; resilient tile flooring; terrazzo floor tile; tile carpeting; special wall surfaces; interior, exterior & high performance paints & coatings; interior signage; phenolic-core toilet compartments; wall & door protection; toilet, bath & laundry accessories; fire extinguishers, cabinets & accessories; metal lockers; flagpoles; roller window shades; plastic- laminate clad countertops; solid surfacing countertops; machine room-less electric traction passenger elevators WAGE = prevailing wage TAX = tax exempt SCHEDULE = Start 3/29/2024 - Completed by 4/29/2025 All RFI shall be submitted by the end of business on February 21, 2024

Award

Fire / Police

$98,775.00

Public - City

New Construction, Site Work

97

36

153

4

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
534
Active Projects
313
Bidding Soon
4,801
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 6, 2024

March 29, 2024

Project location map

2395 Elmwood Ave, Kenmore, NY


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.