BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Wadsworth, Ohio. Completed plans call for site work for a road / highway; and for paving for a road / highway.

PROJECT SUMMARY: This project consists of Crack Sealing asphalt streets per ODOT Item 423 Crack Sealing, Type II. PROJECT LOCATION: This project is located at various locations within the corporation limits of the City of Wadsworth, Ohio as illustrated on the included map. Please email the Quote and direct all inquiries to engineering@wadsworthcity.org. QUOTATION SUBMISSION: Quotations are due by e-mail (engineering@wadsworthcity.org), mail or hand delivered. If mailed or hand delivered, the quotation shall be enclosed in a sealed opaque envelope bearing the name of the Quoter and marked "QUOTATION - 2024 CRACK SEAL PROJECT" Quotations are to be addressed to Wadsworth City Engineering, City Hall, 120 Maple Street, Wadsworth, Ohio 44281 and must arrive by the deadline indicated below. If emailed, please include "QUOTATION - 2024 CRACK SEAL PROJECT" in the subject heading. Please email the Quote and direct all inquiries to engineering@wadsworthcity.org. Quotations must be received no later than Thursday, March 20, 2024 at 3:00 P.M. GENERAL: Quantities are estimated. The City will limit the work to a maximum amount of $50,000. Therefore, quantities may be added or deleted at the City's discretion. The Contractor shall furnish all labor, components, materials, tools, and appurtenances necessary for the performance and completion of the contract. Award of the contract will be determined through an evaluation of quotes and in the best interest of the City. WORKERS' COMPENSATION: Contractor shall procure and shall maintain during the life of this contract workers' compensation insurance for all its employees to be engaged in work on the project under this contract and, in case any such work is sublet, Contractor shall require the subcontractor similarly to provide workers' compensation insurance for all of the latter's employees to be engaged in such work unless such employees are covered by the protection afforded by Contractor's workers' compensation insurance. Contractor shall be required to furnish a copy of a certificate showing that it has complied with the Ohio Workers' Compensation Act and shall relieve City from any and all costs and expenses which may be due to accidents or other liabilities mentioned in said Act. TIME OF COMPLETION: The Contractor shall complete all work activities included in this contract as defined in this RFQ, Contract Documents and the Agreement between City and Contractor based on the Time of Completion table shown below: Time of Completion Table Milestone Date Substantial Completion August 2, 2024 Final Completion November 8, 2024 SCOPE OF WORK The work covered under this contract includes asphalt crack sealing. The work will occur in residential and commercial areas throughout the City. The Contractor shall furnish all labor, materials, equipment, machinery, apparatus and tools, and perform all operations necessary to complete the work specified. Any labor, material, equipment or apparatus not specifically mentioned herein, which may be found necessary to complete or perform any portion of work in a substantial manner and in compliance with the requirements stated or implied by the specifications, shall be furnished by the Contractor without additional compensation. The contractor shall sequence their work as such that all commercial, apartment buildings, and industrial businesses have access at all times. This may require phasing work, utilizing plates, temporary drives, etc. without additional compensation. It should be noted that the plan and priority list included in these documents, may not illustrate the exact areas designated for repair but is to serve as a guideline for the contemplated work. The City of Wadsworth will work with the Contractor throughout the course of the Contract as to the priority of the areas to be repaired up to a maximum total contract amount, not to exceed $50,000. The Contractor shall submit a Maintenance of Traffic plan for all areas of work for approval by the Engineer.

Award

Roads / Highways

$32,500.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
127
Active Projects
72
Bidding Soon
1,198
All Active Projects
488
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 20, 2024

April 19, 2024

img_map_placeholder

Multiple Locations, Wadsworth, OH

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.