Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 8, 2024 at 7:00 PM

Updated April 4, 2024

Renovation of a municipal facility in Charlestown, New Hampshire. Completed plans call for the renovation of a municipal facility.

*Project Overview: ** - Replace existing boiler with a new, efficient model at two facilities - 26 Railroad St. & 233 Main St. - Provide reliable heating/hot water for the specified area. **Scope of Work: ** 1. **Removal of Existing Boiler: ** - Disconnect and remove the old unit. - Properly dispose of the old unit in accordance with local regulations. - Inspect existing ductwork for any damages or obstructions. Current systems are as follows: **Installation of New Furnace/Boiler: ** - Supply and install a high-efficiency boiler, to include domestic hot water suitable for the area's heating/hot water requirements. 233 Main Street is approximately 2748 square feet of space and 26 Railroad is approximately 8656 square feet in s two story building. - Ensure proper sizing of the furnace/boiler based on the heating load calculation for the space. - Install new gas lines, if necessary, to accommodate the new furnace. - Connect the furnace/boiler to the existing ductwork and ensure proper airflow throughout the system. - Install a new thermostat compatible with the furnace model. - Ensure all connections comply with manufacturer specifications and local codes. For inquiries or to schedule a site visit, contact Jason West - 603-371-7201

Post-Bid

Municipal

$50,000.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
673
Active Projects
342
Bidding Soon
4,188
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2024

May 3, 2024

Project location map

Multiple Locations, Charlestown, NH

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed