BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Fort Dodge, Iowa. Completed plans call for the renovation of a educational facility.

Iowa Central Community College intends to enter a guaranteed maximum price contract for the renovation of an existing campus building located at their East Campus and re-roofing of an existing building on their main campus. The East Campus renovation is to include interior renovations of a portion of the main building and exterior renovations of another portion. The East Campus is located at 2031 Quail Ave, Fort Dodge, Iowa 50501 The interior renovation will include the renovation of approximately 4,000 SF of the SE end of the existing building. The exterior renovations will include removal and install of new siding and roofing around the garage on the west end of the facility, the siding will be the perimeter of the building which is approximately 215 LF and the roof approximately 4,712 SF. The project construction drawings are in Schematic Design Phase. The Design Development Phase will commence 4-5 weeks after a Construction Manager at Risk is awarded. Construction is anticipated to commence in August 2024 and tentatively scheduled to be substantially complete by November 2024. Iowa Central Community College will publish a request for qualifications (RFQ) for Construction Manager at-Risk (CMaR) services for the project on March 1st, 2024. The CMaR will be chosen using a two-step solicitation process and chosen on "best value". All CMaR submittals who have demonstrated sufficient qualifications based on the following criteria will be offered the opportunity to submit a request for proposal (RFP) to serve as CMaR for the project: o Projects of similar size and scope in either the public or private sector o Past Performance o Safety Record o Proposed Personnel o Proposed Methodology o Responsiveness to Owner During the proposal stage, qualified respondents shall be asked to submit their proposed fees for the project. Iowa Central Community College will select the proposal that offers the best value based on the published selection criteria and on its ranking evaluation. Projected Timeline: Notice of Intent Posted 2024-02-16 RFQ Posted 2024-03-01 RFQ Final Questions Due- 2024-03-08 2:00 PM RFQ Addendum Issued for Questions 2024-02-12 RFQ Responses Due 2024-03-15 2:00 PM Iowa Central Community College Open & Read RFQ Responses 2024-03-15 2:30 PM CMaR RFQ Response Evaluations Complete 2024-03-20 Iowa Central Community College Approval of Qualified CMaR Shortlist 2024-03-22 RFP Posted 2024-03-22 CMaR RFP Final Questions Due 2024-03-27 CMaR RFP Addendum Issued for Questions 2024-03-29 CMaR RFP Due 2024-04-05 2:00 PM Iowa Central Community College Open & Read RFP Responses 2024-04-05 2:30 PM Iowa Central Community College CMaR RFP Response Evaluations Complete 2024-04-10 Iowa Central Community College Notice of Award to the Selected CMaR 2024-04-12 2:00 PM Owner Architect Ryan Gruenberg Kalob Hays Vice President of Operations Assistant Project Manager Iowa Central Community College ISG One Triton Circle 115 E Hickory Street, Suite 300 Fort Dodge, Iowa 50501 Mankato, MN 56001 gruenberg@iowacentral.edu kalob.hays@isginc.com Office: (515) 574-1053 Office: (507) 469-0750

Post-Bid

Educational

$100,000.00

Public - State/Provincial

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
55
Active Projects
34
Bidding Soon
538
All Active Projects
193
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 15, 2024

August 15, 2024

img_map_placeholder

2031 Quail Ave, Fort Dodge, IA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.