Published May 30, 2024 at 8:00 PM

Updated May 31, 2024

Site work for a transportation facility in Warwick, Rhode Island. Completed plans call for site work for a transportation facility.

**As of May 30, 2024 , This project has been awarded to ControlTouch Systems, LLC, with the awarded amount of $2,884,760.28.** Question submission deadline: 3/15/2024 2PM EST All questions or requests for clarification regarding the bid documents or the project are to be submitted by email to the Office of Procurement via email at procurement@pvdairport.com The scope of work for the Outbound BHS shall be as described below and as outlined in detail in Division 34 77 16. 1. Introduction: a. This project will replace the existing upper level controls and lower level controls of Baggage Handling System (BHS) and TSA baggage screening function in the existing bagroom of Rhode Island T. F. Green International Airport (PVD). b. The existing upper level controls including servers, workstations, and network switches shall be removed and replaced. New upper level servers including two (2) fully redundant fault monitoring servers, two (2) fully redundant database servers and network switches shall be provided in the existing control/server room. Two (2) new workstations shall be provided in the existing control room; each new work-station shall be provided with two (2) new 20" monitors and one (1) 24" monitor. Five (5) new 55" LED graphic displays with computers for displaying the CBIS/BHS statuses shall be provided; the existing control room shall have two (2) graphic displays, the maintenance office shall have one (1) graphic display, and each CBRA room shall have one (1) graphic display. c. All existing PLCs with redundancy modules and ControlNet devices/components in the existing PLC enclosure within the existing control/sever room shall be removed. The BHSC shall provide four (4) new pairs of hot-backup PLCs with new redundancy modules, and EtherNet/IP devices/switches/components as required to have a fully functional CBIS/BHS as specified herein. d. All existing MCPs shall remain; all existing ControlNet devices/components shall be removed. The BHSC shall provide new EtherNet/IP devices/switches/components as required to have a fully functional CBIS/BHS as specified herein. e. The existing two (2) Automatic Tag Readers (ATRs) for baggage sortation shall be replaced with two (2) new ATRs. f. The existing human-machine interface at each existing MCP shall be replaced with a new 15" human-machine interface. g. The BHSC shall replace the existing Variable Frequency Drives (VFDs) with new VFDs. h. The outbound BHS shall be divided into functional zones as described below for North and South Systems. The BHSC shall provide a BHS that complies with these operational, functional, and performance requirements as described below.

Award

Transportation Terminals

$2,884,760.00

Public - City

Site Work

5

10

14

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Substitution Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Flooring, Terrazzo Flooring, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Storage Specialties, Lockers
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Fill
Division 33 - Utilities

Division 33 - Utilities

Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Construction and Equipment, Transportation Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Conveyors, Piece Material Handling Equipment, Lifting Devices, Clamps

Find More Local Projects

Within 75 Miles of This Project
340
Active Projects
169
Bidding Soon
3,121
All Active Projects
1,265
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 28, 2024

April 29, 2024

img_map_placeholder

200 Post Rd, Warwick, RI


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

BHS Improvements Phase I - Controls Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.