BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 12, 2024 at 8:00 PM

Updated May 13, 2024

Site work and renovation of a playground / park / athletic field in Rochester, New York. Completed plans call for the renovation of a playground / park / athletic field; and for site work for a playground / park / athletic field.

Reference Number 0000344610 Job Location: West St Paul Street & Grand River Avenue The City of Brighton, Michigan desires to employ the services of a contractor, or contractors, to repair cracks and coat a concrete wall and steps. Question Acceptance Deadline 03/22/2024 04:00 PM EDT All questions must be submitted via email (shraderb@brightoncity.org) Buyer Preferences, Guidelines & Requirements General Requirements - Bid Deposit Required - Insurance Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % As part of your bid response, it will be required to provide bid security. The bid security must be a certified check or bid bond made out to the City of Brighton for Five Percent (5%) of the Total Bid, in a form approved by the City Attorney. The City reserves the right to accept or reject any or all bids, in part or whole and to waive informalities and minor irregularities in bids received. PROJECT DESCRIPTION AND REQUIREMENTS / SCOPE OF WORK Perform repairs to cracks in the concrete wall and stairs. Grout and seal wall and step cracks with a urethane sealant. Apply sealant to the control joints in the wall and in two locations where the wall meets the stairs. Power wash wall and steps for additional sealant preparation. Apply two (2) coats of Masterseal 58I (formerly Thorocoat) to all exposed portions of the wall and steps. Price will include all materials and labor to complete the entire project. Schedule must be submitted, and project timeframe will be agreed upon with the City to ensure timely completion. The contractor is responsible for maintaining sidewalk safety conditions during project work times, including the time when the area needs to be closed off for curing or drying. The contractor is responsible for all pedestrian safety signage and/or sidewalk closure signage needed. The contractor is responsible for daily cleanup and removal of debris at completion of project. The closing of St. Paul Street is not permitted, although parking spaces adjacent to the pocket park will be available for use during work hours. All parking spaces will need to be available when work is not being performed on site

Award

Playgrounds / Parks / Athletic Fields

$20,223.00

Public - City

Renovation, Site Work

4

4

2

6

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
343
Active Projects
190
Bidding Soon
2,322
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 27, 2024

April 26, 2024

Project location map

2222 St Paul St, Rochester, NY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.