Site work and paving for a road / highway in Sellersville, Pennsylvania. Completed plans call for site work for a road / highway; and for paving for a road / highway.

**As of May 31, 2024, Project has been awarded. Award amount is $162,341.77** Questions Due Date: Apr 15th 2024, 12:00 AM EDT This Project Will Consist of the Excavation of W. Clymer Avenue and a Portion of E. Old State Road to Subbase, 2a Stone Base Repair, 3" of 25mm Wma Bituminous Base Course, and 1 1/2 " of 9.5mm Wma Bituminous Wearing Course. Two (2) M Top Storm Inlets Are to Be Replaced. Items for Sweeping, Installing Utility Risers and Joint Sealing Around Curbs, Manholes, Inlets, and Valve Boxes Will Be Incidental to the Project. Ada Ramp Replacement Will Be Bid as an Alternate Item. The Successful Bidder Who is Awarded the Contract Will Be Required to Pay "online" a Fee in Accordance With Their Established Fee Schedule. Bids Must Be Accompanied by a Certified Check or Bid Bond in the Amount of Ten Percent (10%) of the Bid, Made Payable to the Borough of Sellersville. Award of Contract, if a Contract is Awarded, Will Be to the Lowest Responsible Bidder, but the Owner Reserves the Unqualified Right to Reject Any or All Bids and to Waive Any Informalities. All Current Pennsylvania Department of Transportation Standards and Specifications Will Prevail Over All Standards and Specifications Included in This Contract. The Successful Bidder Will Be Required to Furnish and Pay for Satisfactory Performance and Payment Bonds, Each in the Amount of One Hundred Percent (100%) of the Contract Price With a Corporate Surety Approved by the Owner. The Work in Connection With This Project Constitutes a Public Works by a Public Body Project. Bidders Are Advised That Prevailing Minimum Wage Rates, as Set Forth in the Contract Documents, Must Be Paid to Workmen Employed on This Project. In Addition, the Contractor Must Ensure That Employees and Applicants for Employment Are Not Discriminated Against Because of Their Race, Age, Color, Religion, Sex, National Origin, or Disability. LOCATION OF WORK: West Clymer Avenue, Sellersville, PA 18960 DESCRIPTION OF WORK: Excavation of roadway to subbase, 2A stone base repair, 3” of 25mm WMA bituminous base course, and 1 ½” of 9.5mm WMA bituminous wearing course. Three (3) M Top storm inlets and two (2) C Top storm inlets are to be replaced, as well as the removal of a frame and grate inlet and replacement with a M Top Inlet with Type 4 Box. Items for sweeping, installing utility risers and joint sealing around curbs, manholes, inlets, and valve boxes will be incidental to the project. The work covered under this project shall generally consist of, but not be limited to, the following: 1. Excavation of roadway to subbase (West Clymer Avenue and a portion of E. Old State Road). 2. Contractor to furnish and install any and all grade adjustment rings on utility boxes and manholes as required. 3. Placement of Superpave, WMA, 25 mm base course. 4. Placement of Superpave, WMA, 9.5 mm wearing course. 5. PennDOT 2A stone for base repair). 6. Replace M Top of stormwater inlets. 7. Installation and maintenance of traffic barriers and controls. 8. Providing flag person(s) as necessary to ensure traffic safety. 9. Sealing of all joints with joint sealer as specified on the plans and within the specifications.

Award

Roads / Highways

$162,341.00

Public - City

Paving, Site Work

3

13

3

8

Subscribe For Documents

43 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
435
Active Projects
177
Bidding Soon
3,963
All Active Projects
1,819
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 23, 2024

May 23, 2024

img_map_placeholder

Clymer Ave, Sellersville, PA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.