BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 23, 2024 at 8:00 PM

Updated July 24, 2024

Site work for a civil project in Aurora, Colorado. Completed plans call for site work for a water / sewer project.

Reference Number 0000355912 The new First Creek Interceptor (FCI) system, begins at Aurora's Prologis Lift Station and terminates at the MWRD owned regional Second Creek interceptor. The FCI system will provide a gravity solution for wastewater to reach the Norther Treatment Plan thereby eliminating the need for Aurora's Prologis Lift Station, First Creek Lift Station, Second Creek Lift Station, and High Point Lift Station reducing long term maintenance and energy costs for the utility. The purpose of this project FCI Gravity System Tie-In is to construct the final tie-in at the three lift stations that will become obsolete. These are the Prologis Lift Station located near E Smith Rd and E-470, 1st Creek Lift Station located near E 48th Ave and N Picadilly Rd, and Second Creek Lift Station located near E 68th Ave and Denali St. This project includes construction dewatering, installing pipelines and their appurtenances at each of the respective sites, and site restoration. Question Deadline 07/10/2024 at 2:00 PM MT Questions are submitted online No, Any questions must be submitted in writing by email to Justin Montes, Project Manager, at jmontes@auroragov.org, and to Nathan Jones, Contract Administrator at njones@auroragov.org. Failure to complete the work as prescribed shall be considered as a Breach of Contract and subject to Liquidated Damages which are $1,800.00 per day. The Contract Documents require that all work be Substantially Complete by November 30, 2024 with Final Completion by December 31, 2024. The estimated cost for this project is from $2,517,500.00 to $2,915,000.00. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The City shall have the right to reject any and all Bids.

Post-Bid

Water / Sewer

$2,915,000.00

Public - City

Site Work

19

14

8

4

Subscribe For Documents

111 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
191
Active Projects
64
Bidding Soon
1,321
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 18, 2024

July 23, 2024

Project location map

Multiple Locations, Aurora, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.