Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Flandreau, South Dakota. Conceptual plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; sidewalk / parking lot; and sidewalk / parking lot.
Any questions regarding this Project may be directed to David Ross, Trustee III, at (605) 997-3891 (ext. 1235) or by email at david.ross@fsst-nsn.gov or Seth Pearman, Attorney General, at (605) 573-4206 or by email at seth.pearman@fsst-nsn.gov. Project Description The proposed location of the Crescent Street Bridge will be across the Big Sioux River along the northern portion of Crescent Street in Flandreau, South Dakota. The location can be found in the SE 1/4 of Section 21, Township 107 North, Range 48 West of the Fifth Principal Meridian in Moody County, South Dakota. The newly constructed Crescent Street Bridge will connect a roadway and pedestrian path from the Flandreau Indian School to the City of Flandreau. The Tribe has identified several design preferences for this Project including: (i) elevated side rails on the bridge for enhanced pedestrian safety; (ii) historic LED lighting to be incorporated on the bridge design; (iii) improving concrete tie ins to adjacent recreational areas near Project area; (iv) particular curb and gutter enhancements to ensure vehicle access to adjacent recreational areas and improvement of pedestrian access signage; (v) preferred bridge design with reduced number of piers to avoid collection of debris buildup along waterway; (vi) bridge design should consider frequent usage by larger automobiles, including school buses and semi-trucks; and (vii) educational signage posted on both ends of the bridge containing tribal and local historic information concerning the Project area. Please note this Project includes Federal Lands Highway Program funds, and all work will be reviewed and approved by the Tribe and Bureau of Indian Affairs - Great Plains Regional Office. All work and contract requirements shall conform to requirements of the FHWA, the regulations found under 25 CFR 170, and any and all other applicable laws and regulations. Design standards include but are not limited to: a minimum 100 year design life suitable for a two-lane roadway bridge and two connected pedestrian sidewalks, and a design that ensures the structure is conducive to safety, durability, and economy of maintenance. The scope of work for design and engineering services may generally consist of completing the following tasks: Design and land surveys as necessary to complete the project; Documentation for environmental clearance; Environmental compliance surveys; Environmental permitting; Public involvement process; Economic analysis for three construction alternatives; Roadway/Bridge approach design and plans; Bridge design and plans, including necessary hydrologic and hydraulic information; Geotechnical studies; Right of way plans; Assistance with construction bidding phase (development of Construction RFP, engineer's estimate for construction, etc.); Inspection services during/after construction; Construction management services
Conceptual
Bridges / Tunnels
$580,000.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 18, 2025
S Crescent St, Flandreau, SD
Related To This Project
Flandreau, SD
Bid Date: Mar 26 2024
Flandreau, SD
Bid Date: Apr 04 2024
Flandreau, SD
--
Flandreau, SD
Bid Date: Apr 15 2024
Flandreau, SD
Bid Date: Apr 30 2024
Flandreau, SD
Bid Date: May 30 2024
Flandreau, SD
Bid Date: Feb 02 2024
Flandreau, SD
Bid Date: Dec 13 2023
Flandreau, SD
Bid Date: Jan 19 2022
Flandreau, SD
Bid Date: Aug 04 2023
RFQ Construction Manager - Construction Management services for Restorative Justice Center - 5135560
Flandreau, SD
Bid Date: Aug 11 2023
Flandreau, SD
Bid Date: Apr 26 2023
Flandreau, SD
Bid Date: Apr 09 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.