BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Golden Valley, Minnesota. Completed plans call for site work for a water / sewer project.

Project includes the furnishing of all labor and material for the construction of the TH 55 Watermain Repair at Bassett Creek. Major quantities for the Work include. Description Quantity Unit Mobilization 1 LS Remove Hydrant 1 EACH Abandon Watermain 865 LF Exploratory Excavation 5 HOUR Ductile Iron Fittings 870 LB Temporary Water Service 1 LS Connect To Existing Watermain 3 EACH Connect To Existing Water Service 1 EACH Install Hydrant & Valve 2 EACH 8"-12" Gate Valve & Box 3 EACH 8"-14" Watermain HDPE (Directional Drilled) 1,060 LF 6"-12" PVC Watermain 110 LF Traffic Control 1 LS Fertilizer Type 3 30 LB Rolled Erosion Prevention Category 20 750 SY Seed Mixture 25-131 & 25-141 15 LB The Issuing Office for the Bidding Documents is: WSB LLC located at 701 Xenia Avenue S, #300, Minneapolis, MN 55416; John Bradford, PE 952.210.8280 Bid security in the amount of 5 percent (5%) of the Bid must accompany each Bid in accordance with the Instructions to Bidders. Bidders are required to submit information indicating they have practical experience of the particular construction work bid upon, and that they have the ability and resources to complete the proposed work in a manner satisfactory to the Owner. A contract award will only be made to a bidder meeting the minimum contractor qualifications as stated within the contract specifications. The successful bidder must be a "responsible contractor." The term "responsible contractor" means a contractor as defined in Minnesota Statutes, section 16C.285, subdivision 3. Any prime contractor, subcontractor, or motor carrier that does not meet the minimum criteria or fails to comply with the verification requirements is not a responsible contractor and is not eligible to be awarded a construction contract for the project or to perform work on the project. A prime contractor, subcontractor, or motor carrier that makes a false statement under oath verifying compliance with the minimum criteria will be ineligible to be awarded a construction contract on the project, and the submission of a false statement may result in termination of a contract awarded to a prime contractor, subcontractor, or motor carrier that submits the false statement. A prime contractor shall include in its verification of compliance a list of all of its first-tier subcontractors that it intends to retain for work on the project. Before execution of a construction contract, a prime contractor shall submit a supplemental verification under oath confirming that all subcontractors and motor carriers that the prime contractor intends to use to perform project work have verified to the prime contractor, through a signed statement under oath by an owner or officer, that they meet the minimum criteria for a responsible contractor. The City of Golden Valley reserves the right to reject any and all Bids, to waive irregularities and informalities therein and to award the Contract in the best interests of the City of Golden Valley.

Award

Water / Sewer

$283,881.00

Public - City

Site Work

6

10

7

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
82
Active Projects
48
Bidding Soon
806
All Active Projects
348
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 21, 2024

April 22, 2024

img_map_placeholder

Bassett Creek Dr, Golden Valley, MN

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.