BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Park Ridge, Illinois. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

As of April 3, 2024, project is cancelled. Project is no longer needed. Repair of concrete roadway with concrete patches on Lincoln Ave from Kirby to Hazelwood. Intersection at Lincoln Ave and W Kirby Ave will be asphalt pavement. Refer to Division 01 of the technical specifications for a complete, detailed breakdown of the base bids and alternates for this project. This project includes a Project Labor Agreement that will be executed between the lowest responsible/responsive bidder and the East Central Illinois Building and Construction Trades Council. A copy of the Project Labor Agreement is included at the end. Pursuant to the Prevailing Wage Act, the most current schedule of prevailing wage rates for all crafts (which includes the hourly basic wages, the hourly overtime rates, and the hourly fringe rates for health and welfare, insurance, vacation, and pension benefits) published by the Illinois Department of Labor for the locality in which the work is to be performed, that was available to the Owner at the time the documents were issued for bidding, is attached at the end of Document 00 90 00 and incorporated herein. If the Illinois Department of Labor revises the prevailing rate of hourly wages to be paid by the Owner, the revised rate shall apply to this contract. The prevailing rate of hourly wages is revised by the Illinois Department of Labor and is available on the Illinois Department of Labor's official website. BEP Combined Goal(s) BEP Split Goal(s) VBP Goal(s) MBE/WBE/PBE % MBE % WBE % PBE % VOSB or SDVOSB % 01 - General Work 30 N/A N/A N/A 3 Any Bidding Questions must be submitted to the Engineer by 4 pm on 03/14/2024, via email to AWynn@RME-i.com. Repair of concrete roadway with concrete patches on Lincoln Ave from Kirby to Hazelwood. Intersection at Lincoln Ave and W Kirby Ave will be asphalt pavement. Refer to Division 01 of the technical specifications for a complete, detailed breakdown of the base bids and alternates for this project. This project includes a Project Labor Agreement that will be executed between the lowest responsible/responsive bidder and the East Central Illinois Building and Construction Trades Council. A copy of the Project Labor Agreement is included at the end of Section Lincoln Ave from Kirby Ave to Hazelwood Dr

Project Abandoned

Roads / Highways

$500,000.00

Public - State/Provincial

Paving, Site Work

27

11

5

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
180
Active Projects
94
Bidding Soon
1,889
All Active Projects
815
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 19, 2024

April 4, 2024

img_map_placeholder

S Lincoln Ave, Park Ridge, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.