Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 3, 2024 at 8:00 PM

Updated April 4, 2024

Site work and paving for a road / highway in Park Ridge, Illinois. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

As of April 3, 2024, project is cancelled. Project is no longer needed. Repair of concrete roadway with concrete patches on Lincoln Ave from Kirby to Hazelwood. Intersection at Lincoln Ave and W Kirby Ave will be asphalt pavement. Refer to Division 01 of the technical specifications for a complete, detailed breakdown of the base bids and alternates for this project. This project includes a Project Labor Agreement that will be executed between the lowest responsible/responsive bidder and the East Central Illinois Building and Construction Trades Council. A copy of the Project Labor Agreement is included at the end. Pursuant to the Prevailing Wage Act, the most current schedule of prevailing wage rates for all crafts (which includes the hourly basic wages, the hourly overtime rates, and the hourly fringe rates for health and welfare, insurance, vacation, and pension benefits) published by the Illinois Department of Labor for the locality in which the work is to be performed, that was available to the Owner at the time the documents were issued for bidding, is attached at the end of Document 00 90 00 and incorporated herein. If the Illinois Department of Labor revises the prevailing rate of hourly wages to be paid by the Owner, the revised rate shall apply to this contract. The prevailing rate of hourly wages is revised by the Illinois Department of Labor and is available on the Illinois Department of Labor's official website. BEP Combined Goal(s) BEP Split Goal(s) VBP Goal(s) MBE/WBE/PBE % MBE % WBE % PBE % VOSB or SDVOSB % 01 - General Work 30 N/A N/A N/A 3 Any Bidding Questions must be submitted to the Engineer by 4 pm on 03/14/2024, via email to AWynn@RME-i.com. Repair of concrete roadway with concrete patches on Lincoln Ave from Kirby to Hazelwood. Intersection at Lincoln Ave and W Kirby Ave will be asphalt pavement. Refer to Division 01 of the technical specifications for a complete, detailed breakdown of the base bids and alternates for this project. This project includes a Project Labor Agreement that will be executed between the lowest responsible/responsive bidder and the East Central Illinois Building and Construction Trades Council. A copy of the Project Labor Agreement is included at the end of Section Lincoln Ave from Kirby Ave to Hazelwood Dr

Project Abandoned

Roads / Highways

$500,000.00

Public - State/Provincial

Paving, Site Work

27

11

5

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
516
Active Projects
216
Bidding Soon
4,116
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 19, 2024

April 4, 2024

Project location map

S Lincoln Ave, Park Ridge, IL

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed