BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Hillsboro, Illinois. Completed plans call for site work for a water / sewer project.

Lead Service Line Replacement Question Deadline 03/15/2024 at 4:00 PM CT All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing by email as follows. Woodard & Curran, Inc. Kyla Strickler Email: kstrickler@woodardcurran.com (and a copy to mklekamp@woodardcurran.com) The City of Hillsboro, IL (Owner) invites Bidders to submit sealed Bids for Hillsboro, IL Lead Service Line Replacement. Substantial Completion: within 75 days. Final Completion: within 100 days. Bidding is per 30 ILCS 500 & 557 & any resulting Contract is subject to applicable provisions of the Illinois Compiled Statutes (ILCS) & municipal codes & ordinances. Project Funding: in part through Illinois EPA State Revolving Fund (SRF) & subject to regulations contained in the Procedures for Issuing Loans from the Public Water Supply Loan Program (35 IAC Part 662), the Davis-Bacon Act (40 USC 276a through 276a-5) as defined by the U.S. Dept. of Labor, the Employment of Illinois Workers on Public Works Act (30 ILCS 570), Illinois Works Jobs Program Act (30 ILCS 559/20-1), & the federal "Build America, Buy America Act" requirements as contained in the federal Infrastructure Investment and Jobs Act, Pub. L. No. 117 58. Bid security at 5% of total Bid This procurement is subject to increased use of disadvantaged business enterprises & Bidders are required to undertake specified affirmative efforts at least 16 days prior to Bid opening. It is the policy of the State of Illinois to award a fair share of sub-agreements to disadvantaged businesses (DBEs). Bidders are required to take affirmative steps to assure that disadvantaged businesses are used when possible as sources of supplies, equipment, construction, & services. Bidders shall comply with the terms, conditions, & requirements of the SRF Loan Program, & the Owner's policy & procedures for complying with the requirements. The fair share percentages are 5 percent for MBEs & 12 percent for WBEs. Bidders shall also comply with the President's Executive Order No. 11246, as amended. The requirements for Bidders & contractors under this Order are explained in 41 CFR 60-4. The goals & timetables for minority & female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area are WBE 6.9 percent (Statewide) & & MBE 11.4 percent (Montgomery County).

Post-Bid

Water / Sewer

$700,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

17

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
86
Active Projects
39
Bidding Soon
795
All Active Projects
318
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 23, 2024

May 23, 2024

img_map_placeholder

Multiple Locations, Hillsboro, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.