BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Brisbane, California. Completed plans call for site work for a water / sewer project.

Stairway Water Main Rehabilitation Project The work to be performed under this contract shall consist of, in general, mobilization; providing traffic control; providing construction area signs; daily cleanup; testing; safety; trenchless water main rehabilitation using flexible fabric reinforced pipe (FFRP) and FFRP end connectors; final connections to the existing water main with new water main installed by open trench construction; fire hydrant lateral and assembly replacement; asphalt paving restoration; striping and marking restoration; utility adjustments; cleaning the site at the end of the job; furnishing of all labor, materials, tools, equipment, mechanical workmanship, transportation and services necessary in order to perform a complete job in all aspects as indicated on the plans, and by reference made a part hereof, as specified herein, and as directed by the Engineer at locations shown on the Drawings within the City of Brisbane. Work shall be completed for the Base Bid within 90 calendar days from the effective date of the Notice to Proceed. Each proposal must be accompanied by a certified or cashier's check or by a corporate surety bond on form furnished by the Owner, as a guaranty that the bidder will, if an award is made to him or her in accordance with the terms of his or her proposal, promptly secure workers' compensation insurance, execute a contract in the required form and furnish satisfactory bonds for the faithful performance of the contract and for the payment of claims of material, men and laborers thereunder and insurance as required. Said check or bidder's bond shall be in an amount not less than ten percent (10%) of the estimated total contract payments for the maximum amount of work which may be awarded the bidder in accordance with the terms of his or her proposal, computed based on the sum of the "Total Amount of Bid Items", as stated in the Bid Schedule. The faithful performance bond and payment bond shall be not less than one-hundred percent (100%) of the estimated total amount of the payments to be made to the Contractor under the contract. The work shall be guaranteed for a period of two years after completion, secured with a warranty bond in the amount of one hundred percent (100%) of the amount to be paid under the contract. The Owner reserves the right to reject any and all bids, waive minor informalities not affecting substantial rights and delay award of contract for a period of up to sixty (60) calendar days after the bid opening date. Deadline for Written Comments: 10 April 2024 at 12:00 PM Any additional questions can be sent to Matthew Lee (mlee@brisbnaeca.org)

Award

Water / Sewer

$225,270.00

Public - City

Site Work

8

11

8

10

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
138
Active Projects
83
Bidding Soon
1,852
All Active Projects
753
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 17, 2024

May 17, 2024

img_map_placeholder

Alvarado St, Brisbane, CA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.