BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 28, 2025 at 8:00 PM

Updated March 29, 2025

Site work and paving for a civil project in Brisbane, California. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

** As of March 28,2025 , this project has not yet been awarded. A timeline for award has not yet been established.** Pedestrian Walkway - Alvarado Street to San Benito Road Bid questions will be due in writing to 50 Park Place Brisbane, CA 94005, emailed to Tomas Santoyo at tsantoyo@brisbaneca.org. As shown in the PEDESTRIAN WALKWAY - ALVARADO STREET TO SAN BENITO ROAD plans and required by these specifications and special provisions, this project includes, but is not limited to, furnishing all labor, materials and equipment necessary for constructing concrete stairway, including a prefabricated steel section, on a hillside located within a twelve-foot wide city right-of-way. Construction includes excavation and earthwork, construction of stairways and metal handrails, installation of bollard lights and miscellaneous drainage improvements. Each bid must be accompanied by a Proposal Guarantee amounting to no less than ten percent (10%) of the bid as described in the bid specifications. Said guarantee shall be forfeited to the City in case the bidder depositing the same does not enter into a contract within 10 days after written notice that the contract has been awarded to him. At the time of contract execution, the Contractor shall provide proof of insurance as required in the contract and a surety bond for faithful performance of the specified work in an amount equal to at least one hundred percent (100%) of the contract price. The contractor shall also provide at the time of contract a surety bond for labor and material in an amount equal to at least one hundred percent (100%) of the contract price. All bonds shall be submitted on the bond forms contained in the specifications. The City of Brisbane reserves the right to reject any or all bids, or any part of any bid. The Contractor shall perform all the work, and furnish all the labor, materials, equipment and all utility and transportation services required to complete all of the work of construction and installation of the improvements more particularly described in the plans and specifications One working day will be deducted from the Contractor's total number of working days for each day the Contractor fails to submit the above submittal within the stated time frame. During the course of the work, the Contractor shall update the progress schedule within two (2) working days as requested by the Engineer. Full compensation for Progress Schedule shall be considered as included in the contract unit price paid for the various items involved and no separate payment will be made therefore.

Post-Bid

Roads / Highways

$300,000.00

Public - City

Paving, Site Work

16

7

2

4

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
497
Active Projects
204
Bidding Soon
2,894
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 5, 2025

April 4, 2025

Project location map

Multiple Locations, Brisbane, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.