BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Wilsonville, Oregon. Completed plans call for site work for a playground / park / athletic field; for paving for a playground / park / athletic field; sidewalk / parking lot; and sidewalk / parking lot.

Scope Of Work: ("Work") for the Project consists of furnishing all materials, labor, equipment, and supervision for construction of two asphalt concrete shared-use paths and associated improvements, and performance of such additional and incidental work as called for by the Specifications and Contract Documents. The Work consists of improvements at two separate locations: Park at Merryfield, and Boones Ferry Park. As of the Bid Advertisement Date, the Work at the separate locations is intended to be completed successively, with the Boones Ferry Park location first and the Park at Merryfield location second. Due to grant funding, construction for Boones Ferry Park Trail must be completed by June 25, 2024 and construction for the Park at Merryfield Trail must be completed by December 15 2024. The Park at Merryfield Trail project requires a Wetland Fill Permit. The permit is in process and has not been issued. Construction Notice to Proceed will not be provided at this site until the permit is issued. The estimated Project cost range is $270,000 - $330,000. Bidders must be qualified by the City of Wilsonville ("City") in compliance with ORS 279C.375(3). Bidders must be pre-qualified in compliance with Oregon Revised Statutes Chapter 279C.430 by the Oregon Department of Transportation in the Class of Work "EART" prior to the date bids are due. Bids submitted by a Bidder who is not prequalified prior to the date bids are due will be rejected as non-responsive. In determining the responsiveness and responsibility of any bid submitted, establishing requisite qualification with the City shall not be considered an informality. The choice of bid and/or the rejection of bids will be announced by 5:00 p.m. on April 05, 2024. A contract will be awarded within thirty (30) days after the selection of a qualified Bidder. All bids must be submitted on the forms furnished in the Project Specifications and Contract Documents and each must be accompanied by a Bid Security in the amount of ten percent (10%) of the total bid. The successful Bidder will be required to furnish Performance and Payment Bonds from a City approved surety for faithful performance of the contract in the full amount of the contract price. Question Deadline 03/29/2024 at 5:00 PM PT All questions about the meaning or intent of the Bidding Documents shall be submitted to the Citys Project Manager, in writing. Questions received less than five (5) days prior to the date for Bid Opening will not be answered. Only questions answered by formal written Addenda will be binding. Oral and other interpretations or clarifications are not binding unless confirmed by written Addendum, including discussions at prebid conferences. Addenda Issuance Deadline March 29, 2024, 2:00 p.m For additional information, contact the City Project Manager: Dustin Schull City of Wilsonville 29799 SW Town Center Loop E Wilsonville OR 97070 Telephone: (503) 682-4960 Fax: (503) 682-7025 Email: dschull@ci.wilsonville.or.us The City reserves the right to reject any bid that is not in compliance with all prescribed public contracting procedures and requirements, including the requirement to demonstrate the Bidder's responsibility under ORS 279C.375(3)(b). The City may reject any bid for good cause. The City may also reject all bids upon a finding of the agency that it is in the public interest to do so. The City also reserves the right to cancel this RFP at any time if it determines it is in the best interest of the City to do so. Therefore, Bidders agree that submitting a bid is at their own risk and the City shall have no liability related thereto. When applicable, all bidding shall comply with President's Executive Order No. 11246. The Contractor shall use recyclable products to the maximum extent economically feasible in the performance of the Contract. Bidders are required, prior to submission of bids, to examine the site and Specifications of the contemplated Work. Perceived errors and omissions in the Plans or Specifications shall be called to the attention of the City's Project Manager so that an Addendum may be issued. Failure to do so on the part of the Bidder does not relieve Bidder of responsibility for a correct and completely finished job. No pre-bid meeting will be held for this Project. The following is the anticipated timeline for receiving and evaluating bids and awarding a contract to the most qualified Bidder. Evaluation of Proposals Complete April 05, 2024 Notice of Intent to Award April 05, 2024 Award Protest Deadline April 12, 2024 City Council Award Hearing April 15, 2024, 7:00 p.m. (TBD) Notice of Award April 16, 2024 For additional information, contact the City Project Manager: Dustin Schull City of Wilsonville 29799 SW Town Center Loop E Wilsonville OR 97070 Telephone: (503) 682-4960 Fax: (503) 682-7025 Email: dschull@ci.wilsonville.or.us. Event Bid notes: First-tier subcontractor disclosure submittals from Bidders will be received. Bidders that fail to submit disclosure forms within the allowable time period will be considered non-responsive and the submitted bid will be rejected. Dustin Schull, Parks Supervisor, is the person designated to receive bids. Document note: Requests for documents to be mailed via overnight express shall be accompanied by a separate check in the amount of $35.00. The City shall not be held responsible for the receipt of documents sent via mail. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Playgrounds / Parks / Athletic Fields

$252,831.00

Public - City

Paving, Site Work

20

8

8

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
29
Bidding Soon
576
All Active Projects
282
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2024

May 3, 2024

img_map_placeholder

Multiple Locations, Wilsonville, OR

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.