BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Carlinville, Illinois. Completed plans call for site work for a water / sewer project.

construction of a new 8-inch diameter watermain, valves, connections to existing watermain, replacement of service connections. Substantial Completion: within 90 calendar days. Final Completion: within 120 calendar days. Project Funding: in part through Illinois EPA State Revolving Fund (SRF) & subject to regulations contained in the Procedures for Issuing Loans from the Public Water Supply Loan Program (35 IAC Part 662), the Davis-Bacon Act (40 USC 276a through 276a-5) as defined by the U.S. Dept. of Labor, the Employment of Illinois Workers on Public Works Act (30 ILCS 570), Illinois Works Jobs Program Act (30 ILCS 559/20-1), & "Use of American Iron and Steel" (AIS) requirements as originally contained in Section 436 of the Consolidated Appropriations Act, 2014. (The federal "Build America, Buy America Act" requirements have been waived for this Project.) This procurement is subject to increased use of disadvantaged business enterprises & Bidders are required to undertake specified affirmative efforts at least 16 days prior to Bid opening. It is the policy of the State of Illinois to award a fair share of sub-agreements to disadvantaged businesses (DBEs). Bidders are required to take affirmative steps to assure that disadvantaged businesses are used when possible as sources of supplies, equipment, construction, & services. Bidders shall comply with the terms, conditions, & requirements of the SRF Loan Program, & the Owner's policy & procedures for complying with the requirements. The fair share percentages are 5 percent for MBEs & 12 percent for WBEs. Bidders shall also comply with the President's Executive Order No. 11246, as amended. The requirements for Bidders & contractors under this Order are explained in 41 CFR 60-4. The goals & timetables for minority & female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area are WBE 6.9 percent (Statewide) & MBE 11.4 percent (Macoupin County). Question Deadline 04/15/2024 at 4:00 PM CT All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing by email as follows. Woodard & Curran, Inc. Kyla Strickler Email: kstrickler@woodardcurran.com (and a copy to dtaul@woodardcurran.com)

Bid Results

Water / Sewer

$756,213.00

Public - City

Site Work

12

15

10

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
173
Active Projects
99
Bidding Soon
1,438
All Active Projects
635
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 23, 2024

May 23, 2024

September 20, 2024

img_map_placeholder

IL-108, Carlinville, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.