BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Lowell, Massachusetts. Completed plans call for the renovation of a educational facility.

The bids will be for all labor, materials, equipment, tools, appliances etc. necessary for construction of the Robinson Boiler Replacement. The scope of the project includes the demolition and replacement of the existing boiler system, pumps, and venting. New boilers, pumps, venting, and piping systems will be provided. There will be minor roofing work associated with the installation of the new boiler system in the scope. Any other Work indicated in the Contract Documents is also to be included. Project Location: 110 June St., Lowell, MA 01852. Each bid proposal must be secured by an accompanying deposit of five percent (5%) of the total bid amount and submitted in a sealed envelope clearly marked, "Proposal for ROBINSON BOILER REPLACEMENT PROJECT". The deposit shall be in the form of a Bid Bond, Certified Check, Cashier's or Treasurer's Check, made payable to the City of Lowell, or cash. The successful bidder must furnish a Payment Bond and a Performance Bond of an amount equal to One Hundred (100%) percent of the total Contract Price, issued by a Surety Company, satisfactory to the Commissioner of Public Works. Attention of the Bidders is particularly called to the "Equal Opportunity Clause" and the "Standard Federal Equal Employment Opportunity Construction Contract Specifications" set forth herein. Attention of the Bidders is particularly called to the requirements of the conditions of employment to be observed and the prevailing wage rates to be paid on this project, as determined by the State Department of Labor Division of Occupational Safety. The City of Lowell, acting through its Chief Procurement Officer, reserves the right to waive any informality in, to reject any or all bids or to accept the one which appears in the best interest of the City of Lowell. MBE's are encouraged to submit proposals. EOE/AA. Project Value: $1,650,000 The City reserves the right to reject any or all Bids, if it is in the public interest to do so or for any other good cause, not limited to the following. The City reserves the right to reject any or all Bids, if it determines that the Bidder does not possess the qualifications to perform the Work specified in the Bidding Documents. The City reserves the right to reject the Bid of any Bidder who the City has determined has not completed a prior project, whether with the City or elsewhere, because of the fault of the Bidder, its Subcontractors or employees; has been declared in default on a prior contract whether with the City or elsewhere; has failed to complete a prior project in a timely fashion whether with the City or elsewhere; based on its work record, is not capable of performing the within Contract whether due to lack of sufficient prior experience, as determined by the City, or any other reason; has a work record of its Subcontractors demanding direct payment from the City; has a work record of its Subcontractors, employees or material suppliers complaining to the City or other awarding authority regarding the Bidder's failure to pay them; has a record of complaints made to the City or other awarding authority by persons offended by the behavior of the Bidder, its Subcontractors or employees; or has a record of its failure to comply with the Commonwealth and/or City laws and ordinances or requirements. "Work record" or "record" constitutes a minimum of one event in the work history of the Bidder. The City shall reject every Bid that is not accompanied by a Bid deposit. The contract shall be for the period beginning on or about April 22, 2024 or as stated in the NOTICE TO PROCEED, WHICHEVER IS LATER and end on or before October 15, 2024. Failure to complete the work by the dates herein specified, or any proper extensions thereof granted by the OWNER will be subject to liquidated damages in the amount of $500 per day. Prospective bidders are required to submit all questions in writing to the Chief Procurement Officer by 1:00 P.M. by March 22, 2024. Any questions received after this time will not be considered for review by the City. Contractors should email questions and addendum acknowledgements to the following email address: pmvaughn@lowellma.gov. Please put ROBINSON BOILER REPLACEMENT PROJECT in the subject line. Design Participation: MBEs (6.6%) and WBEs (15%) Construction Participation: MBEs (4.2%) and WBEs (8.8%) Bid results - Electrical - Dagle Electrical Construction Corp. - $106,600.00 Plumbing - Fraser Engineering Company - $98,106.00

Bid Results

Educational

$204,706.00

Public - City

Renovation

17

14

13

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
594
Active Projects
360
Bidding Soon
4,664
All Active Projects
1,885
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 5, 2024

April 22, 2024

October 15, 2024

img_map_placeholder

110 June St, Lowell, MA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.