BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a transportation facility in Boston, Massachusetts. Completed plans call for site work for a transportation facility.

Supplemental Track Improvement Program Contract 2 - Red Line, Systemwide Work will include replacement of ties, rail, restrained rail along both tangent, curved and restrained curve track, removal and replacement of broken or lock spike plates with pandrol plates, insulators and C-Bonds (where called for or where damaged by Contractor), contact rail replacement, ballast replacement (full depth and spot), joint elimination-thermite welding, direct fixation and floating slab repairs including concrete repairs and replacement, surface line and tamping and track stabilizing where directed. CWR will require thermite welding and destressing in accordance with MBTA standards. Work will include concrete work to replace primary and secondar direct fixation slabs. Work may require early action items like weekly meetings with MBTA to plan and schedule work, pre plating ties, site walks to finalize work limits, materials delivery, materials staging, equipment movement, schedule update, etc. Contractor will be required to remove all surplus materials generated by the project and all existing currently within the project limits. All questions during the bid phase should be directed to the MBTA Project Manager, Zeyb Zubairy zzubairy@mbta.com Questions are to be submitted no later than ten (10) days prior to the date set forth for the opening of the bids.

Bid Results

Transportation Terminals

$19,414,786.00

Public - State/Provincial

Site Work

8

21

6

2

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
278
Active Projects
147
Bidding Soon
2,704
All Active Projects
1,121
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 21, 2024

May 20, 2024

img_map_placeholder

Multiple Locations, Boston, MA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.