BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a bridge / tunnel in Walpole, Massachusetts. Completed plans call for site work for a bridge / tunnel.

As of April 1, 2024, this project has not yet been awarded. A timeline for the award has not yet been established. School Meadow Brook Culvert Replacement MassDOT Prequal Required The scope of work includes construction of a modern precast concrete structure with a 10-foot wide and 4-foot-high opening with wingwalls. The proposed work will be performed by isolating the work zone with cofferdams on the upstream and downstream ends of the culvert, with bypass piping to allow streamflow to pass through. The work zone will be dewatered with a pump and all dewatering effluent will be discharged to a sediment basin to remove sediment before water is discharged back to the stream. The existing roadway will be excavated, and the old culvert will be removed. The new culvert will be put in place and backfilled, and the roadway paving and sidewalk will be put back in place. A beaver dam control structure will also be installed to prevent beavers from damming the entrance to the culvert. The proposed beaver dam control device will be built with a wildlife passageway to allow non-aquatic animals to pass around the edges of the beaver structure Every request for such interpretation should be in writing (typed, not handwritten) addressed to Weston & Sampson Engineers, Inc., 55 Walkers Brook Drive, Reading, Massachusetts 01867 Attention: CSD, or sent via email to Mahoney.Carolyn@wseinc.com and to be given consideration must be received at least ten working days prior to the date fixed for the opening of bids The CONTRACTOR hereby agrees to commence work under this contract on or before a date to be fixed in the written Notice to Proceed given by the OWNER to the CONTRACTOR and to fully complete the project within 180 consecutive days of the start date fixed in the Notice to Proceed. The CONTRACTOR further agrees to pay as liquidated damages the sum of $1,000 for each consecutive calendar day thereafter during which the work has not been fully completed, as provided in the Liquidated Damages provisions of Section 00 73 00 SUPPLEMENTARY CONDITIONS

Award

Bridges / Tunnels

$554,400.00

Public - City

Site Work

26

16

2

4

Subscribe For Documents

43 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
381
Active Projects
240
Bidding Soon
2,889
All Active Projects
1,325
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 27, 2024

April 26, 2024

img_map_placeholder

To Be Determined, Walpole, MA

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.