Site work for a water / sewer project in Abbotsford, Wisconsin. Completed plans call for site work for a water / sewer project.

The construction of two (2) municipal potable wells. Well construction shall include the reconstruction of two (2) existing test wells, including installation of a pitless unit for each well; two (2) submersible well pumps with drop pipe, motor and power conductor; two (2) pressure transducers and wire; two 6'x6' reinforced concrete pads around the pitless unit casing at the ground surface; and two (2) prefabricated protective well covers. The work also includes well televising, test pumping, water sampling and field and laboratory analysis, and well disinfection for both wells, and two (2) temporary construction signs. The anticipated substantial completion date is September 1, 2024, and final completion date is October 1, 2024. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the owner as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. Bidder is required to deliver the original certified check or bid bond within 72 hours of bid opening to MSA Professional Services, Inc., Attn: Nora Rickman, 146 North Central Avenue, Suite 201, Marshfield, WI 54449. The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the owner as liquidated damages. We encourage Disadvantaged Business Enterprises (DBEs), including Minority-owned Business Enterprises (MBEs), and Women's Business Enterprises (WBEs) to submit bid proposals. A municipality, in awarding prime contracts, and the primary engineer and primary contractor, in awarding subcontractors, are required to make a good faith effort to achieve a combined minimum goal of 15% participation for MBE/WBE utilization Goals for Women = 6.9 percent (this goal applies nationwide) Goals for minority participation = 0.6 (this goal applies county-wide) Owner reserves the right to waive any informalities or to reject any or all bids. Published by the authority of the city of Abbotsford, Wisconsin.

Award

Water / Sewer

$256,790.00

Public - City

Site Work

8

15

4

9

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
21
Active Projects
12
Bidding Soon
168
All Active Projects
69
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 26, 2024

May 27, 2024

img_map_placeholder

To Be Determined, Abbotsford, WI


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.