BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 29, 2024 at 8:00 PM

Updated May 30, 2024

Demolition, site work, paving, outdoor lighting and new construction of a mixed-use development in Lawton, Michigan. Working plans call for the demolition of a road / highway; for the construction of a road / highway; for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

As of May 29, 2024 no bids were received. No definite date for rebid. Successful bidders are required to furnish 100% labor and material bond and 100% performance bond. Instructions are in the bidding documents. Village of Lawton reserves the right to reject any or all bids. Exterior work to include new public spaces with minor asphalt demo and replacement, concrete curb and gutters, concrete paving/sidewalks, concrete footings, site utilities, site lighting, and site demolition. Construction of a new wood framed pavilion with metal roofing, gutters, and downspouts, is to be included. New synthetic turf, picnic tables, benches, and trees are also to be included per the bid documents. Individual sub-contractor trade bids will be received for work as delineated in the Project Manual and Drawing Set issued for Bids & Permits.

Final Planning

Roads / Highways

$850,000.00

Public - City

Demolition, New Construction, Outdoor Lighting, Paving, Site Work

18

16

13

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
195
Active Projects
106
Bidding Soon
1,524
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 22, 2024

November 29, 2024

Project location map

119 S Main St, Lawton, MI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.