Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 28, 2024 at 8:00 PM

Updated March 29, 2024

Site work, paving and renovation of a mixed-use development in Vallejo, California. Completed plans call for the renovation of a educational facility; for site work for a educational facility; for paving for a educational facility; sidewalk / parking lot; sidewalk / parking lot; and sidewalk / parking lot.

SCOPE: Lease Leaseback Guaranteed Maximum Price Project consisting of the Modernization of 2 Elementary Schools including replacement of mechanical equipment, new roofing, site accessibility upgrades and miscellaneous repairs including dry rot repair, and restroom upgrades. The two campuses are further described below: Wardlaw Elementary School built in 1988 - Permanent buildings encompass approximately 39,575 sq. ft. including 41 classroom spaces, administration spaces, and Multi-purpose spaces. The Scope of Work for Wardlaw includes Campus-Wide Site improvements contain accessible path of travel upgrades, restriping parking, replacement of Mechanical Systems and Roof Replacement in Bldgs A to G. Complete renovation of student restrooms in building C and F to provide accessibility & light upgrades. Steffan Manor built in 1941 - Permanent buildings encompass approximately 47,908 sq. ft. including 37 classroom spaces, administration spaces and a Multi-purpose spaces. The Scope of Work for Steffan Manor includes Campus-Wide Replacement of Mechanical systems, and Campus-Wide roof replacement at most of buildings B, C1, and D, and roof coating at Building A, Part of B, C, and C4. Dry-rot remediation at walkway roof and roof sheathing as occurs during the roof replacement. Complete renovation of two Boys Toilet Rooms in buildings A & D. Limited wall and door demolition and replacement to provide accessibility upgrades. Replacement of accessible parking, accessible door landings, and accessible path of travel upgrades throughout the campus. RFI Deadline is 3/20/24 by 5pm All interested parties may obtain additional information by contacting Glenda Hanes, Operations Support Technician at 852 Rosewood Avenue, Vallejo, California 94591, or via email request to ghanes@vcusd.org.

Post-Bid

Educational

$7,100,000.00

Public - City

Paving, Renovation, Site Work

260

100

95

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
521
Active Projects
199
Bidding Soon
3,523
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 27, 2024

May 27, 2024

Project location map

Multiple Locations, Vallejo, CA


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed