Site work for a power facility in Seattle, Washington. Completed plans call for site work for a power facility.
The Project consists of permitting, design, and construction services for a DB Team to demolish and remove the existing metal-clad switchgear and its components from the Project Site. The switchgear consists of Westinghouse air-blast type circuit breakers installed circa 1950. The DB Team must then provide arc-resistant switchgear compatible with the existing substation infrastructure, and which must be assembled and tested prior to delivery. The relays, meters and controls must be provided in the enclosures and pre-wired according to Seattle City Light (SCL) specifications and standards. SCL Substation Crews will install the connections for the control and alarms from the control room to the new switchgear and assist the DB team with performing the relay commissioning. SCL anticipates that the new switchgear will be smaller in scale and size than the current footprint for the existing switchgear. SCL also anticipates that the new switchgear will weigh less than existing. The DB Team must include design and construction services to structurally infill the existing structure as necessary to accommodate the reduced footprint of the new switchgear to match the existing structure and building envelope. Structural work required also includes evaluating the existing structure for supporting both vertical and lateral loads including seismic loading for the new switchgear and upgrading existing components and structures as needed. A firewall adjacent to the existing transformers must be included in the switchgear building or designed as a stand-alone wall between the switchgear and transformer. It is anticipated that the new switchgear will be installed above the existing roof line (i.e. concrete structure) with cables down to the basement. The project will be phased from 2024 through 2029. SCL's current plan is to replace 1 bus per year, while the other 2 buses carry the substation load.
Post-Bid
Power Plant
$12,000,000.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 17, 2024
August 19, 2024
319 6th Ave N, Seattle, WA
Related To This Project
Seattle, WA
Bid Date: Mar 26 2024
Seattle, WA
--
Seattle, WA
Bid Date: Apr 10 2024
Seattle, WA
Bid Date: Apr 10 2024
Seattle, WA
Bid Date: Apr 03 2024
Seattle, WA
Bid Date: Mar 18 2024
Seattle, WA
Bid Date: Mar 22 2024
Seattle, WA
--
Seattle, WA
--
Seattle, WA
Bid Date: Mar 26 2024
Seattle, WA
Bid Date: Mar 18 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.