Site work for a power facility in Seattle, Washington. Completed plans call for site work for a power facility.

The Project consists of permitting, design, and construction services for a DB Team to demolish and remove the existing metal-clad switchgear and its components from the Project Site. The switchgear consists of Westinghouse air-blast type circuit breakers installed circa 1950. The DB Team must then provide arc-resistant switchgear compatible with the existing substation infrastructure, and which must be assembled and tested prior to delivery. The relays, meters and controls must be provided in the enclosures and pre-wired according to Seattle City Light (SCL) specifications and standards. SCL Substation Crews will install the connections for the control and alarms from the control room to the new switchgear and assist the DB team with performing the relay commissioning. SCL anticipates that the new switchgear will be smaller in scale and size than the current footprint for the existing switchgear. SCL also anticipates that the new switchgear will weigh less than existing. The DB Team must include design and construction services to structurally infill the existing structure as necessary to accommodate the reduced footprint of the new switchgear to match the existing structure and building envelope. Structural work required also includes evaluating the existing structure for supporting both vertical and lateral loads including seismic loading for the new switchgear and upgrading existing components and structures as needed. A firewall adjacent to the existing transformers must be included in the switchgear building or designed as a stand-alone wall between the switchgear and transformer. It is anticipated that the new switchgear will be installed above the existing roof line (i.e. concrete structure) with cables down to the basement. The project will be phased from 2024 through 2029. SCL's current plan is to replace 1 bus per year, while the other 2 buses carry the substation load.

Post-Bid

Power Plant

$12,000,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
87
Active Projects
48
Bidding Soon
903
All Active Projects
333
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 17, 2024

August 19, 2024

img_map_placeholder

319 6th Ave N, Seattle, WA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.