BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 21, 2024 at 8:00 PM

Updated March 22, 2024

Site work for a bridge / tunnel in Elk Point, Alberta. Completed plans call for site work for a bridge / tunnel.

Bridge File No. 6873, Atimoswe Creek, Range Road 73, SW 03-57-07-W4M, 4.3 m Diameter SPCSP Culvert by 34.14 m Invert Length, Bridge Culvert Installation and Other Work Work shall include the installation of a new bridge culvert over Atimoswe Creek, located 6 km southwest of the Town of Elk Point (SW 03-57-07-W4M). The Contractor shall install a 4.3 m diameter Structural Plate Corrugated Steel Pipe (SPCSP) culvert by 34.14 m invert length as per the Drawings and Section 18 of the Standard Specifications for Bridge Construction. The culvert will be located on a 5-degree LHF skew to the local road, centred at Station 5+548.000. The Scope of the Work includes, but is not limited to, the following: Site isolation, turbidity monitoring and fish capture and release Demolition and disposal of existing bridge structure Excavation, including installation of geotextile filter fabric Haul and assembly of culvert materials Placement and compaction of backfill, including backfill material testing Concrete end treatments, including testing and small bridge plaque Installation of heavy rock riprap erosion protection Supply and installation of guardrail

Post-Bid

Bridges / Tunnels

$500,000.00

Public - County

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
20
Active Projects
3
Bidding Soon
88
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 21, 2024

May 1, 2024

Project location map

SW 03-57-07-W4M, Elk Point, AB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.