BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 26, 2024 at 8:00 PM

Updated April 27, 2024

Site work and paving for a road / highway in Flossmoor, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.

All bids offered must be accompanied by bid security in the form of certified check or bid bond made payable to the Owner in the amount of not less than ten percent (10%) of the amount of the aggregate of the bid as a guarantee that if the bid is accepted, a contract will be entered into, and the performance of the contract properly secured. The successful bidder for the project is required to furnish Performance and Labor and Material Payment Bonds in an amount equal to one hundred percent (100%) of the bid amount, with sureties to be approved by the Owner, and in the form required by the Bidding Documents. The successful bidder is required to pay the general prevailing wage for work under this Contract as ascertained by the Illinois Department of Labor, and shall submit certified payroll records, in compliance with the Prevailing Wage Act (820 ILCS 130) and the requirements of the Bidding Documents. The Board of Education reserves the right to reject any or all bids or any part thereof. 2024 Site Paving Improvement Project for Homewood Flossmoor Community High School District 233

Award

Roads / Highways

$521,094.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
473
Active Projects
275
Bidding Soon
3,417
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 22, 2024

May 22, 2024

Project location map

999 Kedzie Ave, Flossmoor, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.