BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Arlington, Tennessee. Contact the soliciting agency for additional information.

The contractor shall provide a cost for the removal of hazardous materials at Kefauver Terrace, Arlington, TN, 38002. The scope of work defines the pertinent tasks and instructions. The contractor shall be responsible for all materials, supplies, and equipment needed to complete all aspects of the scope of work. o The Contractor shall furnish all labor, materials, services, permits, insurance, and equipment which is specified, shown or reasonably implied to perform the following tasks, in accordance with local, state and federal regulations, if these tasks are required as a component of the abatement: o The removal and disposal of the following asbestos containing materials (ACM), including any existing debris: 1. Spray applied ceiling material (ACM), 2. 12x12 Floor Tile & Mastic (all layers to substrate) o The removal and disposal of the following lead containing materials, including any existing debris: 1. Tub/shower surround adhesive. o The Contractor shall remove and dispose of floor trim/cove base material prior to floor demolition. o The Contractor is responsible for all necessary items to accomplish this work to include but not be limited to obtaining and payment for all labor, materials, services, necessary permits, bonding, insurance, and transportation/disposal costs. o The requirements of this Section govern specific aspects of the administration of the Work. The Contractor is responsible for compliance of his own employees and of his subcontractors with the requirements in this Section. o The Contactor is responsible for any incidentals that may occur during construction activities as a result of Contractor/Subcontractor's work. o The Contractor is responsible for all corrections of and changes in the Work, and for any delays resulting from his failure to conform to these requirements, and for all costs arising there from. o The Contractor shall be responsible for all means and methods required to perform the work in accordance with the Contract Documents and within the time limits established in the Contract and this Section. Any prospective bidder desiring an explanation or interpretation of the solicitation, scope of work, etc. must request it in writing to Moshe Cole, Project Manager, Capital Improvements via email to mcole@memphisha.org no later than 4:00 p.m. CST Thursday, March 14, 2024. MHA reserves the right to award this project in its entirety, partially, or not at all. Wage rates paid to employees shall be based on and not less than the latest Non-Routine Maintenance Wage Rates.

Post-Bid

Multi-Residential

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
143
Active Projects
97
Bidding Soon
827
All Active Projects
357
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 21, 2024

April 22, 2024

img_map_placeholder

7620 Robinson Cove, Arlington, TN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.