Published July 11, 2024 at 8:00 PM

Updated July 12, 2024

Site work, paving and outdoor lighting for a transportation facility in Cozad, Nebraska. Completed plans call for site work for a transportation facility; for outdoor lighting for a transportation facility; and for paving for a transportation facility.

Furnishing all labor, materials and equipment and performing all work necessary to: Construct Partial Parallel Taxiway on Runway 13 End Including Taxiway Lighting. In general, this work will require the following approximate quantities: Schedule I: Unclassified Excavation (10,329 CY); 6" Aggregate Base Course (3,700); 6" Concrete Pavement (3,500 SY); 12" Class IV RCP (96 LF); Barbed Wire Fence Removal/Installation; Pavement Marking; Seeding; Bonded Fiber Matrix ----- Schedule II: 1/c No. 8 5kV L-824 Type C Cable (3,450 LF); No. 6 Counterpoise (2,475 LF); 2" Sch 40 Conduit (2,200 LF); 2" Sch 80 Conduit (150 LF); Pushed or Directional Bored (130 LF); L-861T(L) Base-Mounted Taxiway Light (41 EA); Existing Taxiway Light Removal This project is subject to the requirements of 49 CFR Part 26 Disadvantaged Business Enterprise Participation. The Airport Sponsor has established a contract participation goal of 4.76% for small business concerns owned and controlled by certified disadvantaged business enterprises (DBE). The Owner's award of this contract is conditioned upon the bidder satisfying the good faith effort requirements of 49 CFR 26.53. Questions regarding bids shall be directed to Chris Corr, P.E., at 402.458.5056. Site Address: 1304 West HWY 30 Site Directions: Cozad Municipal Airport, Administration Building, 1304 West Highway 30, Cozad, Nebraska It is assumed that Phase 2 & Phase 3 will be completed concurrently with Phase 1. Contractor shall ensure that the entire project is completed within the 35 working days allotted and work within Phase 2&3 are completed within their respective closure times. Contractor shall coordinate with RPR & Airport for Phase 2 & 3 as each phase requires closure of Runway 13/31.

Award

Transportation Terminals

$792,513.00

Public - City

Outdoor Lighting, Paving, Site Work

43

14

2

9

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
7
Bidding Soon
135
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 17, 2024

May 17, 2024

Project location map

1304 US-30, Cozad, NE

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.