Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Cozad, Nebraska. Completed plans call for the renovation of a educational facility.
Elementary School Renovation Project The School reserves the right to reject any and all proposals received that are not deemed to be in the best interests of the School. The School further reserves the right to cancel or amend the RFP and contract documents at any time and will notify all persons requesting proposal documents accordingly Wilkins Architecture Design Planning LLC, a/k/a Wilkins A|D|P, 2204 University Drive, Suite 130, Kearney, NE 68845. The Project Architect's designated lead representative on the Project Team is Jacob Sertich; Tel: 308-237-5787; Email: jsertich@wilkinsadp.com. The scope of construction costs for the Project shall include all labor and materials for construction, construction manager fees and reimbursable expenses, general conditions/aid-toconstruction costs, permits, and special testing, but shall not include any site acquisition costs or architect or engineering fees and reimbursable expenses. The School reserves the right to remove portions of the work on the Project from the CM@R contract and let separate bids if it is deemed to be in the best interest of the School. Question Deadline 12/10/2024 at 4:00 PM CT Questions about or requests for clarification or interpretation of the RFP documents shall be made by email to the School's Legal Counsel, with a copy to the Project Architect, at the email addresses specified in Section 5 above no later than the date and at the time specified in Section 9 above. Interpretations, corrections, and changes of the RFP documents shall be made only by written addendum. The proposed facilities improvement project generally consists of the renovation of the existing elementary school, consisting of eight (8) classrooms and potentially some ancillary spaces (2 restrooms) that were not touched in the 2022 Bond project. Renovation is likely to include new flooring, ceilings, doors, wall finishes, casework and lighting. The location for the Project is 420 East 14th Street, Cozad, Nebraska. The preliminary total construction budget for all costs for the Project is in the range of $200,000 to $300,000. This construction budget includes all costs and expenses for the Project, including but not limited to all labor and materials for construction (subcontracted and self-performed), construction manager fees and reimbursable expenses, general conditions/aid-to-construction costs, permits, special testing and any construction contingency. The construction budget does not include any architect/engineering fees and reimbursable expenses, owner's contingency, furniture/fixtures/equipment. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The proposed facilities improvement project generally consists of the renovation of the existing elementary school, consisting of eight (8) classrooms and potentially some ancillary spaces (2 restrooms) that were not touched in the 2022 Bond project. Renovation is likely to include new flooring, ceilings, doors, wall finishes, casework and lighting.
Post-Bid
Educational
$300,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 19, 2024
May 26, 2025
420 E 14th St, Cozad, NE
Related To This Project
Cozad, NE
Bid Date: Jan 21 2025
Cozad, NE
Bid Date: Oct 09 2024
Cozad, NE
Bid Date: Jan 16 2025
Cozad, NE
Bid Date: Jun 20 2024
Cozad, NE
Bid Date: Apr 17 2024
Cozad, NE
Bid Date: Sep 28 2023
Cozad, NE
Bid Date: Mar 01 2022
Cozad, NE
Bid Date: Mar 03 2022
Cozad, NE
Bid Date: Mar 14 2023
Cozad, NE
Bid Date: Dec 05 2022
Cozad, NE
Bid Date: Dec 15 2022
Cozad, NE
Bid Date: Oct 27 2022
Columbus, NE
Bid Date: Dec 18 2024
Omaha, NE
Bid Date: Dec 11 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
New Year, New Possibilities. Make the connections you need to kickstart 2025.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.