BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 1, 2024 at 8:00 PM

Updated April 3, 2024

Site work and paving for a mixed-use development in Joplin, Missouri. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Project generally consists of intersection improvements for pedestrian safety at the intersection of W 4th Street and Murphy Boulevard including, but not limited to, a new traffic signal, asphalt milling and overlay of the existing roadway, curb and gutter, sidewalks, roadway widening, storm sewer improvements, pavement markings, erosion control, traffic control and other appurtenances required for a complete project. All questions concerning the bid document preparation can be directed to the Engineer, Olsson, Inc. - Jonathan Peitz, PE at jpeitz@olsson.com. Contractors and sub-contractors who sign a contract to work on public works project provide a 10-Hour OSHA construction safety program, or similar program approved by the Department of Labor and Industrial Relations, to be completed by their on-site employees within thirty (30) days of beginning work on the construction project. A certified or cashier's check or a bid bond in the amount of 5% shall be submitted with each proposal. The City of Joplin, Missouri reserves the right to reject any or all bids.

Post-Bid

Sidewalks / Parking Lot

$400,000.00

Public - City

Paving, Site Work

97

10

2

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
147
Active Projects
94
Bidding Soon
968
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 2, 2024

May 2, 2024

Project location map

W 4th Street and Murphy Boulevard, Joplin, MO


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.