BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 26, 2025 at 8:00 PM

Updated September 27, 2025

Site work and new construction of a transportation facility in San Jose, California. Working plans call for the construction of a transportation facility; and for site work for a transportation facility.

**As of September 26 , 2025 project has been canceled. As of this time it is unknown if an when project will rebid. VTA seeks proposals from qualified firmsto provide architectural, engineering, technical services, and design support during construction (Services) for a new Operations Control Center ("OCC") at the Cerone Bus Division. VTA will replace the existing Supervisory Control and Data Acquisition ("SCADA") system and OCC with a new state of the art operations command & control center. The new OCC will be located at VTA's existing Cerone Bus Division at 3990 Zanker Road, San Jose, California and will support both light rail as well as bus operations. Question Submission Deadline:November 12, 2024, 4:00pm The method of Contractor Selection has not been Determined at this time. The Santa Clara Valley Transportation Authority ("VTA") is the result of a 1995 merger between two previously separate entities: the Santa Clara County Transit District and the Congestion Management Agency for Santa Clara County. VTA is an independent special district responsible for bus and light rail operations, congestion management, specific highway improvement projects and countywide transportation planning. As such, VTA is both an accessible transit provider and multi-modal transportation planning organization involved with transit, highways, roadways, bikeways, and pedestrian facilities. Working under the direction of a 12- member Board of Directors ("Board"), VTA's annual operating budget is approximately $550 million, and its currently approved capital program is approximately $2.6 billion. VTA's bus fleet of 435 buses serves a 346 square mile urbanized service area and operates approximately 18 million miles annually. The 42.2-mile light rail system is served by 98 rail cars and 5 historic trolley cars and operates approximately 2.2 million miles annually. VTA employs approximately 2,050 people, of whom approximately 650 are administrative, clerical and professional positions and 1,400 are operators and maintenance positions. There are four operating/maintenance facilities located within Santa Clara County. The administrative headquarters is located separately from these four facilities

Final Planning

Transportation Terminals

$1,000,000.00

Public - County

New Construction, Site Work

312

11

6

4

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
352
Active Projects
181
Bidding Soon
2,770
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 26, 2026

Project location map

3990 Zanker Rd, San Jose, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.