Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 19, 2025 at 7:00 PM
Updated November 20, 2025
Site work and paving for a civil project in Northbrook, Illinois. Design plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.
As of November 19, 2025, this project is in preliminary engineering design. Construction is anticipated to begin in spring 2028. The water main on Walters Road is programmed for replacement to coincide with bicycle accommodations and resurfacing work. The water main on Walters Road is 6-to-8 inch cast iron main that was installed in 1916. The water main is expected to be replaced with 12 inch main as part of this project. In 2022, the Village of Northbrook was awarded $927,022 in Surface Transportation Program (STP) grant funding for the resurfacing of Walters Avenue from Pfingsten Road to Shermer Road through the Chicago Metropolitan Agency for Planning. This funding is programmed for construction to occur in 2027. Additionally, the water main on Walters Avenue was built in 1916 and will be replaced in conjunction to the paving project in an effort to maintain uninterrupted water service to residents and minimize impacts to residents. The Village of Northbrook wishes to improve bicycle accommodations in the Shermer Road corridor between Walters Avenue and Willow Road (MBPP project L23). This project will also include review of intersection improvements at the intersections of Walters Avenue and Pfingsten Road (P26), Walters Avenue and Western Avenue (P27), Walters Avenue and Cedar Road (P28), and Walters Avenue and Shermer Road (P29).
Design
Water / Sewer
$800,000.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 1, 2028
Multiple Locations, Northbrook, IL
Related To This Project
Northbrook, IL
Bid Date: Mar 14 2024
Northbrook, IL
Bid Date: Apr 04 2024
Northbrook, IL
Bid Date: Mar 21 2024
Northbrook, IL
Bid Date: Mar 21 2024
Northbrook, IL
Bid Date: Apr 04 2024
Northbrook, IL
Bid Date: Apr 26 2024
Northbrook, IL
Bid Date: Apr 30 2024
Northbrook, IL
Bid Date: Apr 30 2024
Northbrook, IL
Bid Date: Mar 21 2024
Northbrook, IL
Bid Date: Mar 07 2024
Northbrook, IL
Bid Date: Feb 26 2024
Northbrook, IL
--
Northbrook, IL
Bid Date: Feb 15 2024
Northbrook, IL
Bid Date: Feb 15 2024
Northbrook, IL
Bid Date: Feb 27 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
