Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 20, 2024 at 8:00 PM
Updated April 21, 2024
Renovation of an educational facility in Houston, Texas. Completed plans call for the renovation of a educational facility.
The project includes the demolition and abatement of the existing Foster Elementary School located at 1800 Trailwood Drive 77339 Kingwood, Texas and constructing a new elementary school building. The campus is in a long-established neighborhood and is bound by the neighborhood green belt to the east. The new school will be designed to serve an enrollment of 800, with grades Pre-K, Kindergarten and Grades 1 through 5. The new building will be comprised of 1 double height and two-story elements to meet the Humble ISD design standards, and requirements of the school design. This includes a cafeteria and equipment. The buildings total square footage of approximately 122,000sf and are of masonry, metal wall panels (pac-clad), and steel construction. There is a concrete parking lot in this scope of work of 128 parking spaces and above ground detention. Along with landscaping and the drainage and sub surface for the playground. The playground equipment is not included in the scope of work. This project will have four bidding packages. Questions Deadline: 3/25/2024 03:00 PM (CT) Humble Independent School District ("Humble ISD") is seeking a qualified Construction Manager-at-Risk through a One-Step process for an upcoming Foster Elementary Replacement bond project. The selected Construction Manager (CM) is to assist the District and their Architect, consultants and other professionals with pre-construction services, cost estimates, scheduling and selecting of building systems to build the project thereafter as a Construction Manager-at-Risk. The estimated cost of all construction and demolition is Thirty-Nine Million Dollars ($39M) with a construction start date of September 2024 and substantial completion date of April 2026 you can email linda.collier2@humbleisd.net if you have any questions pertaining to submitting your proposal. All communication regarding this solicitation, including requests for clarification, or questions must be submitted through the Questions tab in Ion Wave or to Michelle Collier, Bond Buyer, @ Linda.Collier2@humbleisd.ne
Award
Educational
$39,000,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
12
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 2, 2024
September 2, 2024
1800 Trailwood Village Dr, Houston, TX
Related To This Project
Houston, TX
Bid Date: Apr 08 2024
Houston, TX
--
Houston, TX
--
Houston, TX
Bid Date: Mar 26 2024
Houston, TX
--
Houston, TX
--
Houston, TX
--
Houston, TX
Bid Date: Apr 10 2024
Houston, TX
--
Houston, TX
--
Houston, TX
--
Houston, TX
Bid Date: Mar 27 2024
Houston, TX
--
Houston, TX
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
