EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 8, 2024 at 8:00 PM

Updated May 9, 2024

Site work and paving for a road / highway in Hanover Park, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The Village of Hanover Park, Illinois is soliciting sealed bids for the 2024 RESURFACING PROJECT It is the responsibility of the bidder to meet all requirements of the bid documents. Bidders are advised of the following requirements of this contract: 1) Illinois Prevailing Wage; 2) 5% Bid Security with the bid submittal; 3) 100% Performance Bond; 4) Adherence to Public Act 30 ILCS 570 Employment of Illinois Workers on Public Works projects. Prequalification of Bidders in accordance with the applicable parts of IDOT Bureau of Local Roads and Streets Recurring Special Provision "Bidding Requirements and Conditions for Contract Proposals" (Check Sheet LRS 6) will be required of all bidders on this proposal. The Board of Trustees of the Village of Hanover Park reserves the right to reject any and all bids or to waive any technicalities, discrepancies, or information in the bids. The Village of Hanover Park does not discriminate in admission, access to, treatment, or employment in its programs and activities. General questions regarding this Invitation to Bid shall be directed to Jonathan Stelle, P.E., CFM, Village Engineer/Assistant Director of Public Works, at 630-823-5700 or jstelle@hpil.org. All detailed questions concerning the actual bid specifications are to be forwarded in writing via email to jstelle@hpil.org no less than five business days prior to the scheduled bid opening date.

Award

Roads / Highways

$3,300,000.00

Public - City

Paving, Site Work

14

15

2

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Construction Layout, Cleaning and Waste Management
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hardware, Door Hardware
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Casework
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Backfill, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Pruning, Bases, Ballasts, and Paving, Unit Paving, Curbs and Gutters, Planting
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Utility Structures
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
219
Active Projects
126
Bidding Soon
2,379
All Active Projects
928
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 2, 2024

May 2, 2024

img_map_placeholder

Multiple Locations, Hanover Park, IL

Related To This Project


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

2024 Resurfacing Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.