Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 2, 2024 at 7:00 PM
Updated December 3, 2024
Site work and new construction of an educational facility in Minneapolis, Minnesota. Working plans call for the construction of a educational facility; and for site work for a educational facility.
The owner has selected a Construction Manager. A timeline for construction has not yet been established. Construction Manager Services for a new facility to replace the current Community-University Health Care Center, located near the Twin Cities campus. The University of Minnesota is requesting Construction Manager at Risk (CMaR) services to participate in the new construction of CUHCC (located at 2001 Bloomington Ave). CUHCC is a Federally Qualified Healthcare Center (FQHC) within the University's Office of Academic Clinical Affairs (OACA). Deadline for RFP Questions October 16, 2024 at Noon The University requires the Project to be substantially complete by no later than December 31, 2027. The University would like to occupy the new building no later than August 2027, but as early as May 2027 pending schedule feedback from the selected Respondent and final dates are subject to further confirmation based on material procurement and lead times. The Project will include construction of a new clinic, approximately 39,000SF with AHU/Air Cooled Chillers and Rooftop PV System. - We will continue to analyze geothermal as an alternate system in SD. o Scope of the project includes the removal of the existing clinic building and reconstruction of the site. o The existing clinic will remain in service until the completion of the new clinic and program transition, note the infrastructure requirements due to the overlap of two facilities operating simultaneously on site. o Scope of the project includes the installation of the fiber pathway, network cabling and power infrastructure to support the new clinic. o The selected Respondent will assist the design team in further analyzing the building configuration / construction methodologies/materials to maximize building efficiency and cost as possible.
Pre-Construction/Negotiated
Educational
$28,000,000.00
Public - State/Provincial
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 22, 2024
December 3, 2024
2001 Bloomington Ave, Minneapolis, MN
Related To This Project
Minneapolis, MN
--
Minneapolis, MN
Bid Date: Mar 27 2024
Minneapolis, MN
--
Minneapolis, MN
Bid Date: Apr 03 2024
Minneapolis, MN
Bid Date: May 10 2024
Minneapolis, MN
--
Minneapolis, MN
Bid Date: Apr 09 2024
Minneapolis, MN
Bid Date: May 30 2024
Minneapolis, MN
Bid Date: Mar 28 2024
Minneapolis, MN
Bid Date: Apr 02 2024
Minneapolis, MN
Bid Date: Apr 03 2024
Minneapolis, MN
Bid Date: Apr 02 2024
Minneapolis, MN
Bid Date: Apr 02 2024
Minneapolis, MN
Bid Date: Mar 14 2024
Minneapolis, MN
Bid Date: Mar 27 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
