BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of an educational facility in Minneapolis, Minnesota. Working plans call for the construction of a educational facility; and for site work for a educational facility.

The owner has selected a Construction Manager. A timeline for construction has not yet been established. Construction Manager Services for a new facility to replace the current Community-University Health Care Center, located near the Twin Cities campus. The University of Minnesota is requesting Construction Manager at Risk (CMaR) services to participate in the new construction of CUHCC (located at 2001 Bloomington Ave). CUHCC is a Federally Qualified Healthcare Center (FQHC) within the University's Office of Academic Clinical Affairs (OACA). Deadline for RFP Questions October 16, 2024 at Noon The University requires the Project to be substantially complete by no later than December 31, 2027. The University would like to occupy the new building no later than August 2027, but as early as May 2027 pending schedule feedback from the selected Respondent and final dates are subject to further confirmation based on material procurement and lead times. The Project will include construction of a new clinic, approximately 39,000SF with AHU/Air Cooled Chillers and Rooftop PV System. - We will continue to analyze geothermal as an alternate system in SD. o Scope of the project includes the removal of the existing clinic building and reconstruction of the site. o The existing clinic will remain in service until the completion of the new clinic and program transition, note the infrastructure requirements due to the overlap of two facilities operating simultaneously on site. o Scope of the project includes the installation of the fiber pathway, network cabling and power infrastructure to support the new clinic. o The selected Respondent will assist the design team in further analyzing the building configuration / construction methodologies/materials to maximize building efficiency and cost as possible.

Pre-Construction/Negotiated

Educational

$28,000,000.00

Public - State/Provincial

New Construction, Site Work

101

7

5

3

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
120
Active Projects
81
Bidding Soon
773
All Active Projects
306
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 22, 2024

December 3, 2024

img_map_placeholder

2001 Bloomington Ave, Minneapolis, MN


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.