BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 7, 2025 at 8:00 PM

Updated August 8, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in James River Bridge, Alberta. Design plans call civil work for a bridge / tunnel.

BF07295 Major Bridge Replacement - Dogpound Creek Bridge On HWY 766, 14Km NW of Didsbury (Construction WAC0090116). TIMELINE: RFP for engineering services was awarded in 2024. Project is currently not included in the owner's 3-year construction program. Construction is tentatively planned for 2030.

Design

Bridges / Tunnels

$8,000,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

5

8

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
71
Active Projects
24
Bidding Soon
615
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.