Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in St. John's, Newfoundland. Contact the soliciting agency for additional information.
Closing Time: 3:00 PM (NT) Question Acceptance Deadline 2024/03/27 03:00:00 PM NDT Scope of Project The Scope of this project is to be completed in the below phases in sequence; Phase I: Mun Feeder No. 04 & 10 Buildings Group Buildings Included: Barnes House, Bowater House, Blackall House, Burke House, Curtis House, Doyle House, Hatcher House, R. Gushue Hall, Rothermere House & Squires House. MUN shall provide all information on the distribution equipment and transformers, exact size and lengths of the feeders & breaker model numbers for all feeders in excel format (See Appendix H). MUN will provide the short circuit information at the main incoming service to the building. MUN will provide all building floor Plans (See Appendix H) Consultant to produce Single Line, for all building sin Phase I, in AutoCAD format with Mun Single Line Template and format. Mun to review and approve final single line drawing. Consultant shall perform a short circuit, coordination and arc flash analysis using ETAP 20.0 or later software. All electronic versions of these files shall be turned over to MUN at the end of the study. Consultant shall prepare a report with all the study information contained in it, as well as any recommendations for system improvements or remediation's, including associated cost estimates. Arc flash labels for all equipment shall be provided within the report as a pdf and xls (MUN to provide templates to consultant, XLS file for List Form, PDF for Labels). Phase II: Mun Feeder No. 02 & 07 Buildings Group Buildings Included: Henrietta Harvey Building, Arts & Administration, Bruneau Centre & Education Building. MUN shall provide all information on the distribution equipment and transformers, exact size and lengths of the feeders & breaker model numbers for all feeders in excel format (See Appendix J). MUN will provide the short circuit information at the main incoming service to the building. MUN will provide all building floor Plans (See Appendix J) Mun to provide single line drawing for all buildings, for reference at the start of Phase II. Consultant shall perform a short circuit, coordination and arc flash analysis using ETAP 20.0 or later software. All electronic versions of these files shall be turned over to MUN at the end of the study. Consultant shall prepare a report with all the study information contained in it, as well as any recommendations for system improvements or remediation's, including associated cost estimates. Arc flash labels for all equipment shall be provided within the report as a pdf and xls (MUN to provide templates to consultant, XLS file for List Form, PDF for Labels). Phase III Mun Feeder No. 05 Buildings Group Buildings Included: C-Core, Centrifuge, Business Administration Building, St Johns College, Spencer Hall, Field Hall, & Queens College. MUN shall provide all information on the distribution equipment and transformers, exact size and lengths of the feeders & breaker model numbers for all feeders in excel format (See Appendix K). MUN will provide the short circuit information at the main incoming service to the building. MUN will provide all building floor Plans (See Appendix K) Mun to provide single line drawing for all buildings, for reference at the start of Phase III Consultant shall perform a short circuit, coordination and arc flash analysis using ETAP 20.0 or later software. All electronic versions of these files shall be turned over to MUN at the end of the study. Consultant shall prepare a report with all the study information contained in it, as well as any recommendations for system improvements or remediation's, including associated cost estimates. Arc flash labels for all equipment shall be provided within the report as a pdf and xls (MUN to provide templates to consultant, XLS file for List Form, PDF for Labels). Phase IV Mun Feeder No. 09 Buildings Group Buildings Included: University Centre, Earth Sciences Building, & Engineering Building. MUN shall provide all information on the distribution equipment and transformers, exact size and lengths of the feeders & breaker model numbers for all feeders in excel format (See Appendix L). MUN will provide the short circuit information at the main incoming service to the building. MUN will provide all building floor Plans (See Appendix L) Mun to provide single line drawing for all buildings, for reference at the start of Phase IV. Consultant shall perform a short circuit, coordination and arc flash analysis using ETAP 20.0 or later software. All electronic versions of these files shall be turned over to MUN at the end of the study. Consultant shall prepare a report with all the study information contained in it, as well as any recommendations for system improvements or remediation's, including associated cost estimates. Arc flash labels for all equipment shall be provided within the report as a pdf and xls (MUN to provide templates to consultant, XLS file for List Form, PDF for Labels).
Conceptual
Educational
Public - State/Provincial
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 7, 2024
Multiple Locations, St. John's, NL
Related To This Project
St. John's, NL
Bid Date: Apr 09 2024
St. John's, NL
Bid Date: Apr 04 2024
St. John's, NL
Bid Date: Apr 02 2024
St. John's, NL
Bid Date: Apr 10 2024
St. John's, NL
Bid Date: Apr 05 2024
St. John's, NL
Bid Date: Apr 12 2024
St. John's, NL
Bid Date: Apr 09 2024
St. John's, NL
Bid Date: Apr 12 2024
St. John's, NL
Bid Date: Apr 04 2024
St. John's, NL
Bid Date: Apr 05 2024
St. John's, NL
Bid Date: Apr 11 2024
St. John's, NL
Bid Date: Mar 25 2024
St. John's, NL
Bid Date: Mar 25 2024
St. John's, NL
Bid Date: Mar 25 2024
St. John's, NL
Bid Date: Apr 15 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.