BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in St. John's, Newfoundland. Contact the soliciting agency for additional information.

Closing Time: 3:00 PM (NT) Question Acceptance Deadline 2024/03/27 03:00:00 PM NDT Scope of Project The Scope of this project is to be completed in the below phases in sequence; Phase I: Mun Feeder No. 04 & 10 Buildings Group Buildings Included: Barnes House, Bowater House, Blackall House, Burke House, Curtis House, Doyle House, Hatcher House, R. Gushue Hall, Rothermere House & Squires House. MUN shall provide all information on the distribution equipment and transformers, exact size and lengths of the feeders & breaker model numbers for all feeders in excel format (See Appendix H). MUN will provide the short circuit information at the main incoming service to the building. MUN will provide all building floor Plans (See Appendix H) Consultant to produce Single Line, for all building sin Phase I, in AutoCAD format with Mun Single Line Template and format. Mun to review and approve final single line drawing. Consultant shall perform a short circuit, coordination and arc flash analysis using ETAP 20.0 or later software. All electronic versions of these files shall be turned over to MUN at the end of the study. Consultant shall prepare a report with all the study information contained in it, as well as any recommendations for system improvements or remediation's, including associated cost estimates. Arc flash labels for all equipment shall be provided within the report as a pdf and xls (MUN to provide templates to consultant, XLS file for List Form, PDF for Labels). Phase II: Mun Feeder No. 02 & 07 Buildings Group Buildings Included: Henrietta Harvey Building, Arts & Administration, Bruneau Centre & Education Building. MUN shall provide all information on the distribution equipment and transformers, exact size and lengths of the feeders & breaker model numbers for all feeders in excel format (See Appendix J). MUN will provide the short circuit information at the main incoming service to the building. MUN will provide all building floor Plans (See Appendix J) Mun to provide single line drawing for all buildings, for reference at the start of Phase II. Consultant shall perform a short circuit, coordination and arc flash analysis using ETAP 20.0 or later software. All electronic versions of these files shall be turned over to MUN at the end of the study. Consultant shall prepare a report with all the study information contained in it, as well as any recommendations for system improvements or remediation's, including associated cost estimates. Arc flash labels for all equipment shall be provided within the report as a pdf and xls (MUN to provide templates to consultant, XLS file for List Form, PDF for Labels). Phase III Mun Feeder No. 05 Buildings Group Buildings Included: C-Core, Centrifuge, Business Administration Building, St Johns College, Spencer Hall, Field Hall, & Queens College. MUN shall provide all information on the distribution equipment and transformers, exact size and lengths of the feeders & breaker model numbers for all feeders in excel format (See Appendix K). MUN will provide the short circuit information at the main incoming service to the building. MUN will provide all building floor Plans (See Appendix K) Mun to provide single line drawing for all buildings, for reference at the start of Phase III Consultant shall perform a short circuit, coordination and arc flash analysis using ETAP 20.0 or later software. All electronic versions of these files shall be turned over to MUN at the end of the study. Consultant shall prepare a report with all the study information contained in it, as well as any recommendations for system improvements or remediation's, including associated cost estimates. Arc flash labels for all equipment shall be provided within the report as a pdf and xls (MUN to provide templates to consultant, XLS file for List Form, PDF for Labels). Phase IV Mun Feeder No. 09 Buildings Group Buildings Included: University Centre, Earth Sciences Building, & Engineering Building. MUN shall provide all information on the distribution equipment and transformers, exact size and lengths of the feeders & breaker model numbers for all feeders in excel format (See Appendix L). MUN will provide the short circuit information at the main incoming service to the building. MUN will provide all building floor Plans (See Appendix L) Mun to provide single line drawing for all buildings, for reference at the start of Phase IV. Consultant shall perform a short circuit, coordination and arc flash analysis using ETAP 20.0 or later software. All electronic versions of these files shall be turned over to MUN at the end of the study. Consultant shall prepare a report with all the study information contained in it, as well as any recommendations for system improvements or remediation's, including associated cost estimates. Arc flash labels for all equipment shall be provided within the report as a pdf and xls (MUN to provide templates to consultant, XLS file for List Form, PDF for Labels).

Conceptual

Educational

Public - State/Provincial

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
41
Active Projects
23
Bidding Soon
296
All Active Projects
144
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 7, 2024

img_map_placeholder

Multiple Locations, St. John's, NL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.