BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 6, 2024 at 8:00 PM

Updated May 7, 2024

Site work and asbestos abatement for an educational facility in Saint Louis, Missouri. Completed plans call for site work for a educational facility; and for asbestos abatement for a educational facility.

Sealed bids are being requested from the Ferguson Florissant School District for Asbestos Abatement at Innovation school at cool Valley. Contact Matthew Furfaro at mfurfaro@ferqflor.org for further information/questions. SCOPE OF WORK: The Ferguson Florissant School District is requesting bids for the abatement of ACM on hydronic heating/cooling pipes and domestic water pipes. There are three locations in which the ACM will need to be abated. The three locations are the main hallway, the boiler room and the chiller room. All Federal, State, County and local regulations must be followed for this project. All abatement work must begin on June 3rd, 2024 and must be completed by June 21st, 2024. The abatement portions of this project must be completed in two containments. The 1st containment must be the main hallway. The 2nd containment must be the boiler and chiller rooms. The hallway must be completed 1st. The reinsulation of domestic water pipes/tanks must be completed by July 12th, 2024. The approved work hours for this project are 7:00am to 3:30pm Monday through Friday

Award

Educational

$63,420.00

Public - County

Asbestos Abatement, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
195
Active Projects
94
Bidding Soon
1,293
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 4, 2024

June 10, 2024

Project location map

1351 S Florissant Rd, Saint Louis, MO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.