BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Marshfield, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

for consideration and recommendation to the Common Council at their regular meeting on Tuesday, April 23rd , 2024 for Award of Contract. Contract 2024-02 includes the opening and construction of new streets within the Green Acres Estates 1st Addition (street opening), including: o 21st Street, Washington Avenue to Green Acres Drive o 23rd Street, Ironwood Avenue to Aspen Avenue o Aspen Avenue, 21st Street to 23rd Street o Ironwood Avenue, 21st Street to 23rd Street o Cottonwood Avenue, 21st Street to 23rd Street o Basswood Avenue, 21st Street to 23rd Street. Street opening/construction will include new sanitary sewer mains, manholes and laterals; new water mains, valves, hydrants and services; new storm sewer mains, catch basins, area drains and storm laterals; along with new streets with drained subbase, pipe underdrains, geotextile fabric, concrete curb & gutter and asphalt pavement, including an asphalt path (asphalt by others). This project will also include the removal/filling of the existing wet pond (located at the southeast corner of 21st Street and Aspen Avenue), construction of a new wet pond detention basin, construction of side/rear lot-line ditches and grading/filling of buildable lots with suitable surplus materials generated from construction of this project. All new streets will remain closed to public and pedestrian traffic until completed. Washington Avenue shall be closed to all traffic (with detour required by Contractor) for the proposed water main connections and street repairs at 21st Street. All underground utility construction is to be completed in 2024. Final paving of some segments to be completed in 2024, with the remaining streets' final curb & gutter and paving to be completed in 2025. Bids will then be reviewed, tabulated, and submitted to the Board of Public Works on Monday, April 15th, 2024 Est. Value: $ 3,800,000.00 Est. Completion Date: July 1, 2025 Pre-Qualification: Yes

Award

Roads / Highways

$2,659,663.00

Public - City

Paving, Site Work

95

6

2

8

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
24
Active Projects
15
Bidding Soon
217
All Active Projects
85
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 10, 2024

June 3, 2024

img_map_placeholder

Multiple Locations, Marshfield, WI


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.