BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a mixed-use development in Sugar Land, Texas. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

As of May 1, 2024, this project has not yet been awarded. A timeline for award has not yet been established. The deadline to ask questions is 3/27/2024 12:00 AM CST. Please contact Rajesh Janarathan with AIG Technical at rajesh.janarthanan@aigtechnical.com. Contract work is for the widening of University Blvd. to six lane divided road and intersection improvements, from New Territory Blvd. to 1000 LF South of Lexington Blvd. The University Blvd. widening consists of reconstruction of inside lane curb sections and intersection improvements at Lexington Blvd., US 59 Frontage Roads, Telfair/Wescott Ave., Brandford Pl., and New Territory Blvd. Work includes clearing and grubbing, removals, relocation of irrigation pipes and valves, grading, landscaping, widening construction of concrete pavement, base and curb; reconstruction of pedestrian ramps and sidewalks, placement of pedestrian poles and ground boxes, signal timing and re-wiring; adjustments to signal heads and placement of signs and pavement markings. Traffic control consists of maintaining barricading along at each end of project, reducing traffic using barrels to one-lane throughout project during day construction, and utilizing detours. The Contractor is responsible for establishing and maintaining a storm water pollution prevention plan (SWPPP) in accordance to the erosion control measures shown in the plans. The contractor must provide the information for Section 4 of the TCEQ Notice of Intent (NOI). The contractor will be designated as the Primary Operator and the City will be the Secondary Operator.

Bid Results

Sidewalks / Parking Lot

$3,207,109.00

Public - City

Paving, Site Work

114

13

2

5

Subscribe For Documents

52 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
69
Bidding Soon
2,665
All Active Projects
988
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 28, 2024

June 10, 2024

img_map_placeholder

Multiple Locations, Sugar Land, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.